1 / 26

Status of the KM3NeT Project

3rd Workshop on Very Large Volume Neutrino Telescopes (VLV n T08), Toulon, France, April 22-24, 2008. Status of the KM3NeT Project. What happened so far The KM3NeT Conceptual Design Report The Preparatory Phase: Towards Implementation. Uli Katz ECAP / Univ. Erlangen 22.04.2008.

Télécharger la présentation

Status of the KM3NeT Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 3rd Workshop on Very Large Volume Neutrino Telescopes (VLVnT08),Toulon, France, April 22-24, 2008 Status of the KM3NeT Project What happened so far The KM3NeT Conceptual Design Report The Preparatory Phase: Towards Implementation Uli Katz ECAP / Univ. Erlangen 22.04.2008

  2. KM3NeT: From the idea to a concept 11/2002 4/2008 2/2006 9/2006 9/2005 3/2004 First consultations of ANTARES, NEMO and NESTOR KM3NeT on ESFRI Roadmap The KM3NeT Conceptual Design Report Design Study proposal submitted KM3NeT on ESFRI List of Opportunities Begin of Design Study U. Katz: KM3NeT

  3. Major achievements • Science & technology • Successful prototype deployments by NEMO and NESTOR • Installation and operation of ANTARES  A large deep-sea neutrino telescope is feasible! • Politics & funding • Endorsement by ESFRI and ApPEC • Funding through EU: Design Study, Preparatory Phase • Funding through national authorities:pilot projects, commitments for KM3NeT • Towards construction • Strong collaboration • Design concepts in CDR U. Katz: KM3NeT

  4. The reference detector • Sensitivity studies with a common detector layout • Geometry: • 15 x 15 vertical detection units on rectangular grid,horizontal distances 95 m • each carries 37 OMs, vertical distances 15.5 m • each OM with21 3’’ PMTs Effective area of reference detector This is NOT the final KM3NeT design! U. Katz: KM3NeT

  5. Science case revisited • Astroparticle physics with neutrinos • “Point sources”: Galactic and extragalactic sources of high-energy neutrinos • The diffuse neutrino flux • Neutrinos from Dark Matter annihilation • Search for exotics • Magnetic monopoles • Nuclearites, strangelets, … • Neutrino cross sections at high(est) energies • Earth and marine sciences • Long-term, continuous measurements in deep-sea • Marine biology, oceanography, geology/geophysics, … U. Katz: KM3NeT

  6. Point source sensitivity • Based on muon detection • Why factor ~3 more sensitive than IceCube? • larger photo-cathode area • better direction resolution • Study still needs refinements U. Katz: KM3NeT

  7. Diffuse fluxes • Assuming E-2neutrino energy spectrum • Only muonsstudied • Energy reconstruction not yet included U. Katz: KM3NeT

  8. Configuration studies • Various geometries and OM configurations have been studied • None is optimal for all energies and directions • Local coincidence requirement poses important constraints on OM pattern U. Katz: KM3NeT

  9. KM3NeT design goals • Sensitivity to exceed IceCube by “substantial factor” • Core process: nm+N  m+X at neutrino energies beyond 100 GeV • Lifetime > 10 years without major maintenance, construction and deployment < 4 years • Some technical specifications: • time resolution 2 ns • position of OMs to better than 40 cm accuracy • two-hit separation < 25 ns • false coincidences dominated by marine background • coincidence acceptance > 50% • PM dark rate < 20% of 40K rate U. Katz: KM3NeT

  10. Technical implementation • Photo-sensors and optical modules • Data acquisition, information technology and electronics • Mechanical structures • Deep-sea infrastructure • Deployment • Calibration • Associated science infrastructure U. Katz: KM3NeT

  11. Optical modules: standard or directional • A standard optical module, as used in ANTARES • Typically a 10’’ PMT in a 17’’ glass sphere • A segmented anode and a mirror system allow for directional resolution • First prototypes produced U. Katz: KM3NeT

  12. … or many small photomultipliers … • Basic idea: Use up to 30 small (3’’ or 3.5’’) PMTs in standard sphere • Advantages: • increased photocathode area • improved 1-vs-2 photo- electron separation  better sensitivity to coincidences • directionality • Prototype arrangements under study U. Katz: KM3NeT

  13. Quasar 370 (Baikal) … or hybrid solutions • Idea: Use high voltage (~20kV) and send photo electrons on scintillator;detect scintillator light with small standard PMT. • Advantages: • Very good photo-electron counting, high quantum eff. • large angular sensitivity possible • Prototype development in CERN/Photonis/CPPM collaboration U. Katz: KM3NeT

  14. Photocathode news • New photocathode developments by two companies (Hamamatsu, Photonis) • Factor 2 in quantum efficiency  factor 2 in effective photocathode area! • Major gain in neutrino telescope sensitivity! Hamamatsu Photonis U. Katz: KM3NeT

  15. Mechanical structures • Extended tower structure:like NESTOR, arm length up to 60 m • Flexible tower structure: like NEMO, tower deployed in compactified “package” and unfurls thereafter • String structure: Compactified at deployment, unfolding on sea bed • Cable based concept: one (large) OM per storey, separate mechanical and electro-optical function of cable, compactified deployment U. Katz: KM3NeT

  16. Deep-sea infrastructure NEMO junction box design • Major components: • main cable & power transmission • network of secondary cableswith junction boxes • connectors • Design considerations: • cable selection likely to be drivenby commercial availability • junction boxes: may be custom-designed, work ongoingin NEMO • connectors: Expensive, reduce number and/or complexity U. Katz: KM3NeT

  17. A green power concept for KM3NeT? • Idea: Use wind and/or solar power at KM3NeT shore installations toproduce the required electrical power. • Requires investment of 4-5 M€. • Can only work if coupled to a larger (public) power network. U. Katz: KM3NeT

  18. Deployment: On the surface … • Deployment operations require ships or dedicatedplatforms. • Ships: Buy, charter or use ships of opportunity. • Platform: Delta-Berenike,under construction in Greece, ready summer 08 Delta-Berenike: triangular platform, central well with crane, water jet propulsion U. Katz: KM3NeT

  19. … and in the deep sea Commercially available ROVs • Deep-sea submersibles are likely needed for • laying out the deep-sea cable network • making connections to detection units • possibly maintenance and surveillance • Remotely operated vehicles (ROVs) available for a wide range of activities at various depths • Use of autonomous undersea vehicles (AUVs) under study U. Katz: KM3NeT

  20. The associated science installation • Associated sciencedevices will be installed at variousdistances aroundneutrino telescope • Issues: • interfaces • operation withoutmutual interference • stability of operationand data sharing • Synergy effects U. Katz: KM3NeT

  21. The candidate sites • Locations of thethree pilot projects: • ANTARES: Toulon • NEMO: Capo Passero • NESTOR: Pylos • All appear to besuitable • Long-term sitecharacterisationmeasurementsperformed and ongoing • Site decision requiresscientific, technologicaland political input U. Katz: KM3NeT

  22. Site characterisation: An example Important parameter: water transparency Capo Passero Pylos (460 nm) Also: optical background, sea currents, sedimentation, biofouling, radioactivity, … U. Katz: KM3NeT

  23. The KM3NeT Preparatory Phase • “Preparatory Phase”: A new EU/FP7 funding instrument restricted to ESFRI projects. • KM3NeT proposal endorsed, funded with 5 M€,coordinated by Emilio Migneco / LNS Catania • 3-year project, 3/2008 – 2/2011; kick-off meeting in Catania, 10-13 March 2008 • Major objectives: • Initiate political process towards convergence(includes funding and site selection/decision) • Set up legal structure and governance • Strategic issues: New partners, distributed sites, extendibility • Prepare operation organisation & user communities • Organise pre-procurement with commercial partners • Next-step prototyping U. Katz: KM3NeT

  24. Timeline towards construction Note: “Construction” includes the final prototyping stage U. Katz: KM3NeT

  25. Your copy of the CDR There is a copy of the CDR for each participant of the VLVnT08 workshop waiting for you outside the auditorium! U. Katz: KM3NeT

  26. Dark Matter Sensitivity • Scan mSUGRAparameter spaceand calculateneutrino flux foreach point • Focus on pointscompatible withWMAP data • Detectability: • Blue: ANTARES • Green: KM3NeT • Red: None of them U. Katz: KM3NeT

More Related