I Welcome and Introduction to the Agenda-Patrick Harger II Supplier Quality Mission/Responsibilities and Organization III PPAP Playbook-Revision “E”-Phani Vutukuri IV PQV(Part Quality Verification) Instructions/Importance-Patrick V PPM(Part Per Million-Defective)–Change in calculations-Patrick.

Télécharger la présentation

NCR Supplier Webcast Agenda-April 15, 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. I Welcome and Introduction to the Agenda-Patrick HargerII Supplier Quality Mission/Responsibilities and OrganizationIII PPAP Playbook-Revision “E”-Phani VutukuriIV PQV(Part Quality Verification) Instructions/Importance-PatrickV PPM(Part Per Million-Defective)–Change in calculations-Patrick NCR Supplier Webcast Agenda-April 15, 2013

  2. NCR Global Supplier Quality Team 4-5-13 6/51 Global Director of Supplier Quality Patrick S Harger PPAP and PQV Manager of Supplier Quality Phani Vutukuri India Region Manager of Supplier Quality Venkatesan Mohan APAC Region Manager of Supplier Quality YL Chang European Region Manager of Supplier Quality Norbert Teker Americas Region Manager of Supplier Quality JD Thieke

  3. European Region Supplier Quality Team 2 Global Director of Supplier Quality Patrick S Harger European Region Manager of Supplier Quality Norbert Teker SQEEngineer Nairn Mitchell SQE Engineer Open position-UK SQEEngineer Edina Szujo SQE Engineer Open position-BUD 4-5-13 • Total H/C – 5

  4. AsiaPacific Supplier Quality Team 6 Global Director of Supplier Quality Patrick S Harger Asia Pacific Region Manager of Supplier Quality YL Chang SQE Tone Li SQE Sally Liu SQE Yao Peng SQE Nemo Ruan SQE Amanda Yang SQE Leo Xu 4-5-13 • Total H/C – 7

  5. Global Supplier Quality – Americas Last update: 2013-04-08 JD Thieke Supplier Quality Americas Mgr North America South America Barry Kohut Supplier Quality Southern Region Luciano Barros Supplier Quality Manaus Region Jinwu Fan Supplier Quality Midwest Region Alexandre Iartelli Supplier Quality Sao Paulo Region (Metals) Open Supplier Quality Auditor Dante Maneschi Supplier Quality Sao Paulo Region Open Repair Supplier Quality Central America Region

  6. India-Supplier Quality Team 6 4-5-13

  7. India-PPAP & PQV Team 27 4-5-13

  8. NCR New Parts Supplier Quality Responsibilities • Mission: Create processes and infrastructure within NCR and our Supply Base to insure all active parts are consistently, statistically capable going into our factories and field. • Therefore: • We perform Supplier Assessments to add/remove from our Approved Supplier List • We formulate the PPAP policies and procedures and maintain the PPAP (Production Part Approval Process) Playbook on the NCR website for all suppliers. • We assess risk factors for each part and establish the PPAP Levels • We schedule and review all PPAP submissions from suppliers • We schedule and perform either Physical PQV (Part Qualification Verification) audits at suppliers or review Eaudits submitted by suppliers. • We issue SCARs for PPAP or PQV failures and approve all SCAR responses even if initiated by another part of the organization. • We manage data to provide PPM and supplier performance data to the suppliers and to the NCR Organization • We work with suppliers to resolve quality issues and drive Root Cause Corrective Action

  9. 2013 Parts Quality Plan Services Parts “Usage” Focus Top 10 – Asia, Europe, CLA, Top 20 – NAMER 40 Unique Parts Repair Supplier Focus 50 Unique Parts Impact Parts List - 190 parts Mfg Parts Focus 85 Parts (PQV only) Logistics Parts “Spend” Focus - 15 Unique Parts NFF% Improvement Target= 23% OBF% Improvement Target= 3.0% Time to 1st Failure Improvement Time to 2nd Failure Improvement PQV Capability 2013 Start Target Yield= 97% 2013 Volume Part Focus 3200 parts (includes 190 above) PQV Count Achievement (3200 part/qtr.) = 100% PQV SCAR Accountability Resolve Issues Preventatively PQV Capability Target = 3200 parts, Yield = 97%

  10. PPAP Playbook Changes

  11. Major Changes • Characteristics on the prints & Capability Requirements – Modified • Mandatory Fields Interlocked with Production Warrant Sign off • Packaging & Labeling Requirements added • Improved Clarity & Reporting of Performance Test Requirements • Guidance provided for Equivalent / Alternate Material documentation • Added features to guide users to avoid Administrative issues • User Manual Created to help Users on how to fill the PPAP Playbook and the requirements

  12. Dimensioning & CpK Standards – Sep 2011

  13. Dimensioning & CpK Standards – Nov 2012

  14. Dimensioning & CpK Standards – Feb 2013

  15. Packaging • Documentation Requirement • Production Warrant • Packaging Test Report • Test result format provided in PPAP Playbook • Note – PPAP Request will cover where Packaging Information required for approval

  16. Labels • Documentation Requirement • Production Warrant • Dimension Report • Material Test Report • Appearance Report • RoHS • PPAP will be Granted “ Interim Approval” with PPAP PSW sign off • Full approval granted after Successful LTO Completion • obtain Signature on label from Plant QA and maintain as Master Samples

  17. Pop Up Error Message – for any errors in mandatory fields Pop Up Error Message

  18. Pop Up Error Message for If alternate material is used without RFC approval • Do not allow Production Warrant Sign off Pop Up Error Message • Once RFC details provided – Production Warrant Sign off is enabled RFC Number

  19. Separate Tab sheets added for • RoHS Compliance Report • Salt Spray Test Report • Performance Test Report • Balloon drawing • Sub supplier source • Packaging Test Report New New New New New New

  20. CCD to RCD

  21. RCD – Require d Closure Date Accepted Update to Merlin & tracker PPAP Commit Date Actual Submitted Date Review Date Request for PPAP • Performance Measured to Suppliers Committed Dates CCD Reject Path Request for PPAP with RCD Submit PPAP Review Date Approved Date ECC DR Release NPI / ESECC / B Builds etc. Parts Availability / AT Builds Last Submitted Date Reject Path RCD • Performance Measured to NCR Requested Dates • Target to achieve >95% for Q4

  22. Additional Changes • PPAP Request shall have • Engineering Drawing [ OR Print ] • Drawing from PPAP team – with Critical Dimensions identified where required – in pdf version • Required Closure Date [ RCD ] • Contact Information in case of queries / issues • Blank Playbook Rev E

  23. PVQ (Part Quality Verification) Process Objective: To routinely verify that suppliers are providing consistent, statistically compliant parts and assemblies to NCR plants , repair suppliers and customers. Preparation for NCR SQ Engineer (SQE) and the Supplier 1. Review PPAP history and revision level on file. Take copy for comparison. 2. Note and take any active Engineering Change Notices to discuss impact and timing of next PPAP. 3. Determine status of parts to be measured: A. Preference is to use parts that are being manufactured at time of PQV or B. Take parts from supplier stock-note date of manufacture and revision level or C. Take parts from NCR stock as last resort. 4. Pull SCARs and PPM/Quality history for reference for continuous improvement. 5. Pull past PQV history for follow up and notation of consistency of control. 6. The preparation, by the supplier, is critical to be efficient and effective when the SQE arrives. 7. Parts should be gathered, numbered and data should be taken prior to SQE arrival.

  24. PVQ (Part Quality Verification) Process Objective: To routinely verify that suppliers are providing consistent, statistically compliant parts and assemblies to NCR plants, repair suppliers and customers. On-Site PQV Instructions-II Manufacturing Process/Control Plan Review A. Review the process flow chart. If it has changed, supplier should resubmit PPAP. B. Review Control Plan & data collection. Note any actions taken when not in control. C. Verify that the operators know how to STOP the process and what they need to do contain product and re-start the process according to their control plan. D. Assign action plans to supplier if not satisfied with controls in place and follow up. E. Review the PFMEA, discuss any additions performed and/or needed. F. Issue SCAR(s) as required to assure documented non- conformances.

  25. PVQ (Part Quality Verification) Process Objective: To routinely verify that suppliers are providing consistent, statistically compliant parts and assemblies to NCR plants , repair suppliers and customers. On-Site PQV Instructions-Data Gathering and Analysis A. For critical dimensions (CD); review Gage R&R (GRR) and note who were the ‘operators’ and measurement instruments. Assure that the same operators and instruments are used for PQV. B. Witness at least 3 samples (of the 30 samples for Cpk calculation) for all CD when operator is taking data. C. Collect data, review and draw conclusions relative to requirement of Cpk>1.67 D. Assign actions items to correct/contain any non conforming parts from supplier to NCR. E. Select 5 samples for ‘minor’ dimensions that have had SCARs. All measurements must be within print tolerance. F. When there are no critical dimensions for a PQV, review SCARs for verification of effectiveness with documented evidence. G. Assure the Control Plan has been modified and/or the PFMEA modified.

  26. PPM-Defective-The Basic Formula Supplier PPM = Quantity of “supplier liable parts defects” Quantity of all parts receipts Eligible supplier PPM parts will be those received by NCR into our factories and warehouses and on the books of NCR Parts located inside of supplier locations, their distributors and VMI warehouses are not eligible for PPM defect reporting as they are not received by NCR

  27. Rejects counted as Supplier PPM Parts are rejected from the following areas where deemed supplier fault • Reject from NCR WIP inventory • Reject from NCR stock purge or screen • Counted regardless of supplier or NCR performing the screen / rework • Reject from NCR incoming inspection screen or full lot rejection • Counted regardless of supplier or NCR performing the screen / rework • Supplier spills/escapes - recall of defective parts or NCR finished goods • Customer spills/escapes – recall of defective parts that reached customer

  28. Rejects NOT counted as Supplier PPM Parts rejected where supplier fault cannot be established or is yet to be established • Parts returned to supplier for defect analysis – typically electronics • Typically known as “in process” disposition • Will not be recorded as supplier PPM at time of disposition • Will be recorded as PPM once supplier analysis is completed • In transit parts shipped prior to closure of a reported SCAR • Parts received at NCR at time of raising a SCAR will be counted • Parts remaining in transit – not yet received by NCR after the closure of the SCAR will not be counted – will be flagged for quarantine at incoming

  29. Rejects NOT counted as Supplier PPM (cont’d) Transit damage parts • Will not be counted if damage is due to carrier mishandling • Will not be counted if legacy packaging is deemed to be inadequate and needing improvement – correct action is to raise a SCAR for correction • Will be counted where supplier did not follow their defined packaging process • Will be counted where supplier did not follow NCR specified packaging requirements • No clear specification for the defect • Will not be counted if the defect is completely within published design specifications, Corporate standards, drawings, or quality criteria of which they have been informed. • Improved criteria should be negotiated with Engineering / PPAP / QA as required to eliminate ambiguous criteria • Co-parts rejected • i.e. when a defective harness damages a motor – the harness supplier is liable for one defect, the motor supplier is not liable for a defect

  30. Wrap Up and Summary • The revised PPAP Playbook (Rev E) is now in force and will be on the NCR website after 4/18/13 • It has been expanded to include items such as packaging and labels • Access to the PPAP Playbook including forms and training is at: • http://www.ncr.com/about-ncr/suppliers/manuals-forms-and-templates • The PPM calculation has been expanded beyond receiving inspection to include all supplier-caused rejected parts. • The focus this year is on the 3200 parts we have identified for PPAP and PQV • The 190 “Impact Parts List” is included in the 3200 parts list • There will be a higher level of PPAP and PQV performed on assemblies and electronics this year with more emphasis on identifying critical characteristics of the functioning assembly or electronic unit. • Your India PPAP Team, NCR Engineering and your assigned SQE will be in touch with those suppliers who have parts on the 190 Impact Parts List to focus on field usage and/or field failures to improve the MTBF (Mean Time Between Failure). • It is imperative that our suppliers contain issues and drive for sustained, statistical control of their products delivered to NCR. • Expect quarterly PQV Audits (either physical audit or Eaudit) by your NCR Team. Please be prepared! Thank you for attending. There will be a hard copy of the presentation available soon on the website. Are there any questions or comments?

  31. Contact Information • My contact information is: • Patrickshelby.harger@ncr.com • Cell phone: 802-310-1691 • I look forward to traveling to many of your sites in early 2013 to meet your staff and view your facilities.