Project Manager P. Paolucci M. Tytgat & G. Pugliese

Conference Committee chairman. Editorial board chairman. Istitution Board chairman. Resource manager P. Paolucci. Project Manager P. Paolucci M. Tytgat & G. Pugliese. Steering committee. Tech. Coordination S. Buontempo A. Dimitrov. DPG D. Piccolo K. Bunkowski C. Carillo.

malory
Télécharger la présentation

Project Manager P. Paolucci M. Tytgat & G. Pugliese

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Conference Committee chairman Editorial board chairman Istitution Board chairman Resource manager P. Paolucci Project Manager P. Paolucci M. Tytgat & G. Pugliese Steering committee Tech. Coordination S. Buontempo A. Dimitrov DPG D. Piccolo K. Bunkowski C. Carillo Run Coordinator L. Benussi deputy Upgrade Resp. deputy RPC IB - Pigi Paolucci

  2. Resource managerP. Paolucci Project Manager P. Paolucci M. Tytgat & G. Pugliese Steering committee Tech. Coordinator S. Buontempo A. Dimitrov Upgrade Resp. deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C. Carillo Maint & repar A. Dimitrov Physic Valid Tool S. Costantini new Online K. Bunkowski new CAF A. Cimmino new Offline D. Piccolo P5 L. Benussi new Detector & trigger analysis C. Carillo new RPC IB - Pigi Paolucci

  3. DPG D. Piccolo K. Bunkowski Run Coordinator L. Benussi deputy Detector & trigger analysis C. Carillo Phys Valid Tool S. Costantini Offline D. Piccolo Online K. Bunkowski Local Reco C. Carrillo DQM Cimmino ConfigurationK. Bunkowski Detector perfomance Calabria SoftwareValidation/ Data Certification J. Gho Detector DB Trigger perfomance Resp. Run Quality Korea Simulation Pavlov Trigger DB M Szlepper Calibration Streams Maggi Noise tools Costantini DataBase DCS WBM Berzano Upgrade Simulation Skims Tupputi Covered RPC IB - Pigi Paolucci Manpower needed Not covered

  4. Preliminarversion Technical Coordination S. Buontempo A. Dimitrov Upgrade responsable deputy Bakelite CERN test site Test beam Nicolas Mainten. & repair. (RE,RE) Anton & Hassan Electronics Gap production Chamber test Documentation Dimitrov mechanics DCS Trigger Warsaw Front-end electronic Equipment DB cooling cooling Link board electronic Ghent site Equipment DB Gas Benussi India site installation CERN site commissioning

  5. DPG Not covered tasks RPC IB - Pigi Paolucci

  6. TC covered tasks RPC IB - Pigi Paolucci

  7. 2011 Manpower/ExpertResident at CERN (>40%) • Korea Univ: Taejong(70%), MeeHee Cho (50%), HyungChul Kim (30%) • SKK Univ: HyunkwanSeo (50%), Min SukKim (70%), JunghwanGoh (30%) • Chandigar: • Mumbai BARC: • Pavia: • China: • Sofia Univ: Dimitrov • INRNE: Stoianov • Egypt: • Ghent:Costantini, Cimmino, Zaganidis, Phd ? • Napoli: Buontempo, Carrillo, Paolucci • LNF: Benussi, Piccolo • Uniandes: Ocampo, Gomez, Phd ? • Pakistan: Shahzad • Brussels: Van Doninck, Luc Van Lancker • Bari: Pugliese, Maggi, Colaleo, Calabria, Lusito, Tupputi RPC IB - Pigi Paolucci

  8. 2011 Manpower/Expert(not resident) • Korea Univ: • SKK Univ: • Chandigar: • Mumbai BARC: • Pavia: Vitulo, Belli • China: • Sofia Univ: Litov, Pavlov, Petkov, Hadjiisk • INRNE: Stoianov, Genchev, Sultanov • Egypt: • Ghent:Tytgat • Napoli: Fabozzi • LNF: Bianco • Uniandes: • Pakistan: Horani, Saleh • Brussels: • Bari: Abbrescia, Iaselli RPC IB - Pigi Paolucci