An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Expo Line Community Meeting Maintenance Facility Design Workshop January 23, 2012

  2. Meeting Agenda Maintenance Facility Design Workshop • Meeting Purpose and Format • Overview of Design Process and Timeline • Overview of Site and Building Design Concept • Next Steps

  3. Design Process Overview of Final Design Process and Timeline Design Kick-Off Conceptual Design Summer 2011 Design Development Fall 2011 Final Design Spring 2012 Regular updates to community and stakeholder groups on design progress Construction Documents Fall 2012 Construction Spring 2013 – Fall 2014

  4. Design Process Overview of Community Input • Community Meeting # 1: Community Design Considerations • Sound • Traffic • Visual • Safety • Community Meeting #2: Scenario Presentation and Selection

  5. Design Process Site Plan

  6. Design Process Principles of Design • Operations • Sustainability • Building Materials • Site Context

  7. Operations On-Site Traffic Flow Olympic Blvd Exposition Boulevard

  8. Operations Site Layout

  9. Sustainability Leed Certification • Water Management • Storm water tank • Day Lighting • Clear glass skylights • Conditioned Space • Building HVAC • Passive Ventilation • Operable office windows

  10. Building Materials Precast Insulated Concrete Panels • Benefits: • Durable and low maintenance exterior and interior • Effective thermal and moisture protection • Ease of construction

  11. Building Materials Storefront Glazing • Benefits: • High performance insulated glazing • Transparency • Articulates south facade • Breaks down scale • Properly shaded • Louvers and overhangs block direct sun

  12. Building Materials Metal • Benefits: • Longevity and Durability • Low Maintenance • No paint required • Sustainable • High recycled content • Energy • Low embodied energy

  13. Site Context Exposition Boulevard View View from Exposition Boulevard looking Northwest

  14. Site Context Northwest View

  15. Site Context Southwest View

  16. Site Context Yorkshire Avenue View View from Yorkshire Avenue looking North

  17. Site Context Design Concept Aerial View

  18. Next Steps Next Steps in the Design Process • Incorporate community input on design concept where feasible • Continue design development • Return for further input on specific design elements

  19. Design Process Maintenance Facility Site

  20. Site Context Site Cross-Section

  21. Sustainability Sustainability- Conditioned Space

  22. Sustainability Sustainability- Passive Ventilation

  23. Sustainability Sustainability- Storm Water Tank

  24. Sustainability Sustainability- Day lighting