1 / 19

CRITERIA FOR GREEN BUILDINGS IN LEBANON

CRITERIA FOR GREEN BUILDINGS IN LEBANON. Prepared by: The “Order of Engineers & Architects of Beirut” in collaboration with: Maya Karkour, Sara Jaber, Aram Yeretzian, Bassam Haber, Ziad Haddad & Wissam Tawil. Table of Contents. Introduction Green Building Criteria Energy

marja
Télécharger la présentation

CRITERIA FOR GREEN BUILDINGS IN LEBANON

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CRITERIA FOR GREEN BUILDINGS IN LEBANON Prepared by: The “Order of Engineers & Architects of Beirut” in collaboration with: Maya Karkour, Sara Jaber, Aram Yeretzian, Bassam Haber, Ziad Haddad & Wissam Tawil

  2. Table of Contents • Introduction • Green Building Criteria • Energy • Water Use Efficiency • Indoor Environmental Quality • Environmental Impact

  3. A- Introduction • Reasons to prepare the criteria • Scope of the criteria - Building Types - Climatic Zones Four Climatic Zones as defined in the Thermal Standard for Buildings in Lebanon - 2005

  4. B. Green Building Criteria Water Use Efficiency Energy Indoor Environmental Quality Environmental Impact

  5. 1. Energy Follow TSBL 2005 as issued by Ministry of Public Works & Transportation for insulation of walls, roofs, floors & glazed elements • Building Envelope • Energy Efficiency Minimum energy efficiency of DX, chiller or boilers to follow Ashrae 90.1 – 2007 Electric Hot Water Heaters to follow RT 2005 – art 58 • Elevators & Escalators Elevators: Building with more than 4 floors, use VVVF technology Escalators: Use on demand or reduce speed

  6. Artificial Lighting Lighting Power Densities for building (Interior) Lighting Power Densities for building (Exterior)

  7. Occupancy / Motion Sensor Electronic Ballasts • High frequency electronic ballast for fluorescent & Metal Halides conforming to IEC 60598 • Common lobbies • Parking • Circulation • Stairs • Keeping a max of 25 % of the normal lighting • Control System • Heat Recovery • Independent temperature control for A/C per zone. • Hotel room management • Thermostatic valve for radiators • Outside compensation recommended • 100 % FA AHU’s with heat recovery system. • Heat recovery on generators for hotels, hospitals, industrial facilities of certain areas.

  8. Insulation on Pipes & Duct • Energy Metering • As per Ashrae Standards 90.1.2007 for ducts & pipes • Electric metering for building with multiple Tenant. • Energy meters for building supplied with central chilled water or heating system. • Renewable Energy • In single family houses, Solar Panels to cover a min 70% of yearly hot water demand. • Residential building up to 4 stories, Solar Panels to cover min 30 % of yearly hot water demand. • In case of excessive external lighting above the allowable rate in Residential Building, PV panels shall be used to cover this excess.

  9. 2. Water Use EfficiencyA. Building Water Use Reduction • Efficient Sanitary Fixtures • Condensate Drain Recovery • Building with more than 200 tons, 80 % of condensate to be recuperated for irrigation, toilet flushing or cooling towers in zones 1 & 2 • Automatic shut off for public faucets

  10. B. Site Water Use Reduction • Efficient Irrigation • Rain Water Harvesting • Controllers with moisture sensors. • Drip or subsoil water delivery system. • Obligatory all single family houses, and collected from at least 25 % of roofs & external terraces. • Used for irrigation, toilet flushing, or general cleaning.

  11. 3. Indoor Environmental Quality • Natural Ventilation • Mechanical Ventilation • Openable area is 4 % of the internal floor area. • Opposite sides if between 7 & 15 m depth. • Follow Ashrae 62.1.2007 for occupied areas. • Follow decree 7964 for parkings.

  12. VOC Emissions – Paints & Coatings • Thermal Comfort 95 % of the year • Low Volatile Organic Compound for min 80 % of the paints internal surface. • Comply with: Green Seal GS-11 EN 13300:2001 EU Directive 2004/42/CE21

  13. Daylighting • Acoustic Performance • Comply with Lebanese Construction Law • Comply with Lebanese Official Gazette 1269/1996

  14. 4. Environmental Impact4.1 Impact of Construction Works • Dust Control • Erosion & Sedimentation Protection • Top soil shall be covered by sheets to prevent air pollution • Silt fences to be installed around the site to prevent annoyance to neighboring properties and land.

  15. Protection of Ecological Features Noise Control • Trees, hedges, ponds, water sources, wet land, not within building foot print shall be protected • Operate during the hours permitted by the applicable local regulations. • Construction Pollution • Construction Waste Management • Dumping of excavated soil or construction waste onto adjacent sites is prohibited. • Mandatory for Grade A project as defined in Decree 7964

  16. 4.2 Landscape • Vegetated Walls • Vegetated Roofs • Planters • 25 % of landscape area shall be vegetated. • In case of no landscape area, then 10 % of site area shall be vegetated on roofs, walls or planters.

  17. 4.3 Heat Island Effect • All buildings should have another 25 % either: - vegetated - Covered with high SRI material - Shaded by SRI material - Shaded by solar panels - Or a combination of the above • Roofs shall have 50 % of the non tech area: • Vegetated • Covered with high SRI • Shaded with high SRI • Shaded by solar panels • Or a combination of the above SRI: Index combining reflectivity & emissivity.

  18. Night Time Light Pollution • Operational Waste • Min 2 containers or bins for recyclable waste • Downward lights are required • Refrigerant Impact • Zero Ozone depleting potential (ODP)

  19. Conclusion: • A good start for implementing Green Philosophy in the construction law. • Neutralize the impact of the increase in exploitation rate. • Enhance the indoor quality environment. • Enhance the construction quality. • Reduce the energy and water consumption.