An ACSLite Case Study Riva Road in Annapolis, MD

Kevin L. Newton, TSOS Traffic Engineer Anne Arundel County DPW Matthew J. Allen, PE, PTOE Traffic Engineer Wallace Montgomery ( SWaM Certified). ITS: The Next Generation ITSVA Annual Conference Richmond, Virginia April 19-20, 2012. An ACSLite Case Study Riva Road in Annapolis, MD.

marlie
Télécharger la présentation

An ACSLite Case Study Riva Road in Annapolis, MD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Kevin L. Newton, TSOS Traffic Engineer Anne Arundel County DPW Matthew J. Allen, PE, PTOE Traffic Engineer Wallace Montgomery (SWaM Certified) ITS: The Next Generation ITSVA Annual Conference Richmond, Virginia April 19-20, 2012 An ACSLite Case StudyRiva Road in Annapolis, MD

  2. Agenda • Project Introduction and Overview • CMAQ Funding • ACSLite Basics • Riva Road ACSLite Deployment • Before & After Study • Lessons Learned • Questions

  3. An ACSLite Case StudyRiva Road in Annapolis, MD Project Introduction

  4. Project Introduction and Overview

  5. Project Introduction and Overview

  6. An ACSLite Case StudyRiva Road in Annapolis, MD CMAQ Funding

  7. CMAQ Funding • Congestion Management and Air Quality Grant • 80% Federal contribution - 20% County match • County fronts money and is reimbursed • Documentation requirements • Initiated Grant process - Fall 2008 • Received Approval - July 2009 • Completed Before Studies - March 2010 • ACSLite System On-line - November 2010 • Completed After Studies - March 2011

  8. CMAQ Funding • Project Costs • Initial Estimate $141,200 (County share $28,240) • Network Equipment Requirements ≈ $40,000 • Engineering Studies ≈ $27,000 • Total Project Costs ≈ $218,000

  9. An ACSLite Case StudyRiva Road in Annapolis, MD ACSLite Basics

  10. ACSLite Basics • ACSLite – Adaptive Control System • Developed by FHWA • Siemens • University of Arizona • Purdue University • Test sites in US • CA, FL, OH, TX • CA, OH, TX, MD

  11. ACSLite Basics • Closed loop signal system • Recommend fiber connectivity • System continuously monitors signalsand traffic flow • Adjusts Real Time • System Offset Times • Signal Split Times • Signal Cycle Lengths arenot adjusted

  12. ACSLite Basics • Evaluate & Monitor • Provide Refinements • 3 Levels of Optimization • Time of Day • Runtime Refiner • Transition Manager

  13. ACSLite Basics • Typical ACSLite Field Application

  14. ACSLite Basics • Riva Road ACSLite Field Application

  15. ACSLite Basics • ACSLite Screen Shot – Detector Status

  16. ACSLite Basics • ACSLite Screen Shot – Pattern Status

  17. ACSLite Basics • ACSLite Screen Shot – Phase Timing Status

  18. An ACSLite Case StudyRiva Road in Annapolis, MD Riva Road ACSLite Deployment

  19. Riva Road ACSLite Deployment • Wait for the completion of Fiber installation • Installed 20 new Video Detector Cameras • Upgraded signal controllers to accept network connectivity (NTCIP) • Installed dedicated ACSLite computer • Assisted by • RGA, LLC / Siemens • County Signal Technicians • County Information Technology Technicians

  20. An ACSLite Case StudyRiva Road in Annapolis, MD Before & After Study

  21. Before & After Study • CMAQ evaluation requirements • Select Measures of Effectiveness (MOEs) • Travel Time and Delay • Vehicle Emissions • Minor Street Queues • Analyzed two “Corridors”

  22. Before & After Study

  23. Before & After Study Travel Time (sec) Ave Speed (mph) Riva Road Corridor Total Delay (sec) Emissions (grams*)

  24. Before & After Study Travel Time (sec) Ave Speed (mph) Riva Rd / Forest Dr Corridor Total Delay (sec) Emissions (grams*)

  25. An ACSLite Case StudyRiva Road in Annapolis, MD Lessons Learned

  26. Lessons Learned • Accurate Baseline System • “Groundhog Day Effect” • Detection, Detection, Detection • Infrastructure/Communications Link • Emissions Computations • Use of Technology for Data Collection Would we do it Again?

  27. An ACSLite Case StudyRiva Road in Annapolis, MD Questions?

  28. Kevin L. Newton, TSOS Traffic Engineer Anne Arundel County DPW Matthew J. Allen, PE, PTOE Traffic Engineer Wallace Montgomery (SWaM Certified) MAllen@WallaceMontgomery.com 410-494-9093 ITS: The Next Generation ITSVA Annual Conference Richmond, Virginia April 19-20, 2012 An ACSLite Case StudyRiva Road in Annapolis, MD