1 / 10

TIA MEID Database (db) Overview (updated from December 2011)

TIA MEID Database (db) Overview (updated from December 2011). Gary V. Pellegrino, Chair TIA TR-45 Ad Hoc ESN/UIM/MEID CommFlow Resources, Inc. April 2012. Overview of TIA MEID db. TIA MEID db Capabilities TIA MEID db Phase 1 Development - includes some mission critical capabilities

marlon
Télécharger la présentation

TIA MEID Database (db) Overview (updated from December 2011)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TIA MEID Database (db) Overview(updated from December 2011) Gary V. Pellegrino, Chair TIA TR-45 Ad Hoc ESN/UIM/MEID CommFlow Resources, Inc. April 2012

  2. Overview of TIA MEID db • TIA MEID db Capabilities • TIA MEID db Phase 1 Development - includes some mission critical capabilities • TIA MEID db Testing / Phase 1 Rollout • TIA MEID db Phase 2a Development • TIA MEID db Potential Phase 2b Development

  3. TIA MEID db Capabilities (1) • TIA development started 1Q 2011 and ongoing • Online tool for MS-mobile station (MEID) and card manufacturer (MEID for EUIMID) applications for MEID assignments • Improved MEID Administration efficiency • Timely near real-time data exchange to/from GSMA IMEI database of multimode assignments • Source for MEID online redacted reports - Present MEID report distribution methods will remain in place for a reasonable overlap time after MEID db implementation

  4. TIA MEID db Capabilities (2) • CDMA operators access to MEID and IMEI/MEID multimode assignments - operator agreements with TIA will be arranged • Robust MEID administration checks & balances • Security mechanisms e.g., https; robust encryption

  5. TIA MEID db Capabilities (3) • Proprietary MEID db information maintained with device/card Manufacturers [limited to view own information] and Operators [wider view of subset of information for all manufacturers] access levels • Platform for future MEID CEIR (Centralized Equipment Identity Register) consideration • Other applications may be considered in future; some are operator dependent (Phase 2b)

  6. TIA MEID db Phase 1 Development • Design online equivalent of all SC.R4002-0 MEID paper application and assignment forms, with multi-mode enhancements • Unique user log-in, password and robust encryption measures moved to Phase 1 from Phase 2 to accelerate early facilitation of operator access and manufacturers maintaining complete library of Forms within MEID db • Internal TIA Administrator tools • Redacted online MEID assignment reports • Targeted development of Enhanced Phase I now estimated completeduringQ2’2012

  7. TIA MEID db Testing & Phase I Rollout • Internal, external alpha test trials of preliminary Phase I (manufacturer application – Form A) started 3Q 2011 • ARIB - Japan Regional MEID Administrator visited TIA January 17-20,2012 providing an in-depth review and user experience validation • Beta testing (with user log-in, password) now expected to start late 2Q 2012; complete 3Q 2012 and will include operators as well as device manufacturers • MEID db access criteria via websiteand restrictions are being defined • Initial live rollout now expected during late 3Q 2012 - Service provider TIA membership required • Update SC.R4002-0 with online form screen shotsannex; publish prior toTIA MEID db Phase I rollout (in progress)

  8. TIA MEID db Phase 2a Development • Bi-directional TIA MEID db – GSMA IMEI db Interface testing and implementation • This Interface is expected to allow near real-time Multi-Mode assignment data exchange between TIA MEID db and GSMA IMEI db - Initial design and development in progress [TIA providing first draft Legal Disclaimer Language to GSMA ( presently monthly.xls exchanges with GDA)] • MEID db optimization; enhancements • Targeted development completion mid 4Q 2012 • Targeted implementation late 4Q 2012 (after robust testing complete)

  9. TIA MEID db Potential Phase 2b Development • Potential Development of MEID CEIR - Industry segments (e.g., India & CDG) expressed EIR and CEIR interest and appearstheir EIR implementationmay be accelerated • Design future capabilities with industry input (particularly operator requirements) • MEID db optimization; additional enhancements • Targeted activity from 4Q 2012 to 2013 depending on operator requirements • Targeted completion dependent on desired functionality and operator requirements

  10. Contact Information Further Comments, Inquiries Welcome Gary V. Pellegrino, Chair TR-45 EUMAG (gary@commflowresources.com) John Derr, MEID Administrator - TIA (jderr@tiaonline.org) Cheryl J. Blum, Vice President Technology and Business Development - TIA (cblum@tiaonline.org) Jeff West, MEID db Project Manager - TIA (jwest@tiaonline.org)

More Related