An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SMED principlesapplied to Formula 1 racing MGMT 6650 8 August 2013

  2. 2013 Malaysian Grand Prix pit-stop1 http://www.youtube.com/watch?v=iAHn6W1S1DU

  3. What is SMED? • Single-Minute Exchange of Die • is one of the many lean production methods for reducing waste in a manufacturing process. It provides a rapid and efficient way of converting a manufacturing process from running the current product to running the next product.2

  4. SMED value to business3 • Economic Order Quantity • Historically maximize production count to keep unit overhead cost low. • High production counts create inefficiencies in other areas. • SMED allows smaller production runs while retaining low unit cost. • SMED supports just-in-time inventory.

  5. Toyota background4 • Shigeo Shingo - Toyota Production System, SMED • Changing multi-ton precision dies on vehicle body transfer-stamping machines took anywhere from 12 to 36 hours to complete. • By applying SMED PrinciplesToyota reduced changeover time to less than 10 minutes. • Creating an EOQ of less than 1 car.

  6. SMED 8 techniques for consideration5 • Separate internal from external operations • Convert internal items to external items • Standardize the function, not the shape • Eliminate fasteners or use functional clamps • Use intermediate jigs • Adopt paralleloperations • Eliminate adjustments • Use mechanization

  7. SMED 7 Reduction steps6 Observation (A) Separation (B) Conversion (C) Simplification on internal (D) focus on fixings Standardization of external activities(D) similar scale to internal Documentation Repetition

  8. Key observations for improvement7 • shortages, mistakes, inadequate verification of equipment causing delays and can be avoided by check tables, especially visual ones, and setup on an intermediary jig • inadequate or incomplete repairs to equipment causing rework and delays • optimization for least work as opposed to least delay • unheated molds which require several wasted 'tests' before operating temperature to work • using slow precise adjustment equipment for the large coarse part of adjustment • lack of visual lines or benchmarks for part placement on the equipment • forcing a changeover between different raw materials when a continuous feed, or near equivalent, is possible • lack of functional standardization, that is standardization of only the parts necessary for setup e.g. all bolts use same size spanner, die grip points are in the same place on all dies • significant operator movement around the equipment during setup • more attachment points than actually required for the forces to be constrained • attachment points that take more than one turn to fasten • any adjustments after initial setup • any use of experts during setup • any adjustments of assisting tools such as guides or switches

  9. SMED Techniques in action • Separate internal from external operations • Tools, tires, crew ready to go • Convert internal items to external items • Captive wheel-nut • Standardize the function, not the shape • Each crew has specialized task • Eliminate fasteners or Use functional clamps • Single wheel-nut • Minimal threads • Use intermediate jigs • Alignment tape with position marks • Adopt paralleloperations • 4 teams – 4 tires, other activities • Eliminate adjustments • Pre-calibrated air guns • Use Mechanization • Air guns with backup • Jacks

  10. 2011 Monaco Grand Prix8 http://www.youtube.com/watch?v=RHUTYpIpBg8

  11. Art of Pit stop9 • By Infiniti Red Bull Racing http://www.youtube.com/watch?v=lfAIvXzRXPc • Timing: 00:00:02.05

  12. Record Breaking Pit-stop team

  13. Q & A