1 / 22

Big Ideas part 2

Big Ideas part 2. May 19, 2014. City of Duluth Unified Development Code. Agenda. Big Ideas to discuss: Downtown Buford Highway Multi-Family Design Standards Transitional Standards. 2. Downtown Plan. Buford Highway. 3. Downtown Plan. Existing Zoning. M-1. M-1. CPD-R. R-100.

marnie
Télécharger la présentation

Big Ideas part 2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Big Ideaspart 2 May 19, 2014 City of Duluth Unified Development Code

  2. Agenda Big Ideas to discuss: Downtown Buford Highway Multi-Family Design Standards Transitional Standards • 2

  3. Downtown Plan Buford Highway • 3

  4. Downtown Plan Existing Zoning M-1 M-1 CPD-R R-100 CPD-C M-1 CBD M-2 CPD-C • 4

  5. Downtown Plan Proposed Zoning HRD (Historic Residential District) CBD • 5

  6. Downtown Plan Proposed Concept Plans / Site Plans consistent with Illustrative Master Plan Land Use HRD (Historic Residential District) CBD Street Layout Streetscape • 6

  7. Downtown Plan • Design standards • Updated CBD standards • - Based on Downtown Overlay District • (DOD) standards • Modify where inconsistent with Downtown Plan • Planning Department review replaces CPD-C and CPD-R Review Boards • Exception: inconsistencies with Downtown Plan, then forward to Planning Commission • 7

  8. Downtown Overlay District (DOD) • 8

  9. Downtown Overlay District (DOD) • Proposed scaled-back DOD boundary • Apply CBD design standards Existing Conditions within the Hall Circle Target Area Existing Condition along Buford Highway in Downtown Duluth Potential improvement of Buford Highway in Downtown Duluth • 9

  10. Buford Highway • Remove Buford Highway Overlay District (BHOD) • HC-1 (proposed) • South of Davenport • Allows auto uses • Additional landscape screening • HC-2 (proposed) • North of Davenport • Prohibits auto uses • 10

  11. Buford Highway Arcade Awnings and Wall Offsets Portico Alcove • Existing building design standards require: • Architectural treatment • Blank walls • Building materials • Pitched roofs • Standards apply to HC, C-1, C-2, O-I, O-N, M-1 and M-2 • Propose differentiating standards for commercial vs. industrial districts • 11

  12. Buford Highway • Roof types • Allow flat roofs in commercial and industrial districts

  13. Industrial Metal Split Face Concrete Block Tilt-Up Concrete • Building materials • Allow other materials in addition to brick, stone, stucco or wood in M-1, M-2 • 13

  14. RM District – Design Standards • Brick, stone, stucco, and/or lap siding (wood or HardiPlank) • Number of sides? • Percentage of materials per side? • 14

  15. RM District – Design Standards VS Wall offsets / material change in building plane

  16. RM District – Design Standards VS Shared Parking Lot Two Car Garage Two covered parking spaces Other design considerations?

  17. Transition The effective date of the UDC will be established when it is adopted. For properties that are already at some stage in the development approval or permitting process, they would be exempt from the UDC . • 17

  18. Transition • Subdivisions • Preliminary Plats and development plans approved prior to the effective date of the UDC … • Can proceed to completion if construction begins within 1 year of plat approval, and • The work proceeds on a continuous basis. • 18

  19. Transition • Site development plans, development permits and building permits. • Site development plans approved, and development permits or building permits issued prior to the effective date of the UDC … • Can proceed to completion if construction begins within 1 year of plan approval or permit issuance, and • The work proceeds on a continuous basis. • 19

  20. Transition • Recently approved rezoning or special use. • A zoning map amendment or special use approved within 6 months before the UDC effective date … • Will be honored if a development permit or a building permit is issued within 6 months after the UDC effective date, and • The permit does not expire due to lack of construction activity. • 20

  21. Transition • Applications in Process. • A valid and complete application for rezoning or special use approval, development or construction approval accepted prior to the UDC effective date … • Can be considered under the previous regulations if the application is approved within 6 months after the UDC effective date, and • The use, development or construction begins within 6 months after approval. • 21

  22. Transition • Effect • When the use of or construction on an exempt property is completed, inconsistencies with the UDC will be treated as legal nonconformities. • After the UDC effective date, all new applications for zoning, development or variances will follow the procedures in the UDC. • The owner of an exempt property has the option to comply with new UDC regulations if more advantageous. • 22

More Related