An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Nadine ALLEMAND Objectives of the presentation Provide information of components of investment and operating costs Provide information on the composition of working documents Present data required from national experts for estimating costs in their own countries and for aggregation of data for CIAM

  2. Components of investment costs • Pollution control equipment expenditure • Pollution control device • Auxiliary equipment • Instrumentation Installation expenditure (For VOC reduction techniques considered equal to costs of the pollution control device itself) • Project definition and engineering, • Contractor selection costs and contractor fees, • Building and civil works (foundations, supports, erection, electrical, piping, insulation, painting…), • Performance testing and start up

  3. Components of operating costs Fixed operating costs • Insurance, licence fees, taxes • Maintenance Variable operating costs • Man power costs, • Raw material and chemical consumption, • Waste water treatment, Waste disposal, • Electricity consumption, • Energy costs : steam, natural gas, solid or liquid fuel, • Replacement of materials : catalyst, activated carbon… • Avoided costs : energy recovery, solvent recovery…

  4. Estimation of costs Costs : expressed in € 2000 Investment costs I : € Annualised investment costs A : € / year A = I . (1+q)n . q . ((1+q)n-1)-1 n : reduction equipment life time (year) p : interest rate (4 % imposed) q = 1+p/100

  5. Estimation of costs OCtot : Total operating costs - € / year OC fix : Fixed operating costs A certain percentage of investment costs related to maintance, taxes and administrative overhead (a given percentage of I) OCvar : Variable operating costs Costs for additional labour demand, electricity use, fuel consumption, savings of solvents…

  6. Estimation of costs OCtot : Total operating costs - € / y OCtot = OC fix + OC var TAC : Total annual costs - € / y TAC = A + OCtot Total annual costs per tonne of pollutant abated - € / t pollutant TAC / ∑ t of pollutant eliminated

  7. Working document composition Chapter 1 : Introduction Chapter 2 : Short technology description Chapter 3 : EU regulations implementing emission limits Chapter 4 : Definition of reference installation Chapter 5 : Emission abatement techniques and costs Primary measures Secondary measures Chapter 6 : Data to be provided by national experts Chapter 7 : Explanatory notes Chapter 8 : References

  8. Description of the quality of data Rank from 1 to 5 For emission factors : 1 : very poor: no measurements (or mass balances, literature review) 2 : poor : based on a single measurement 3 : fair : based on a series of measurements in several plants 4 : good : based on calculations or systematic manual measurements 5 : very good : continuously monitored

  9. Description of the quality of data Rank from 1 to 5 For cost items : 1 : estimate of a single expert 2 : based on pre-feasibility study 3 : based on costing done for an investment project 4 : ex post evaluation of a group of projects 5 : ex post evaluation of a large investment program

  10. Uncertainties Definition of the IPCCguidelines are used For costs and emission factors : 95 % confidence interval Interval that has a 95 % probability of containing the mean value (for a normal distribution ± 2 standard deviations)

  11. For uncertain quantities combined by addition Uncertainty of the sum : U total : percentage uncertainty in the sum of the quantities (half the 95% confidence interval divided by the total (i.e. mean) and expressed as a percentage) xi, Ui : uncertain quantities (expressed as mean value) and the percentage uncertainties associated with them (expressed as CI%), respectively

  12. Specific data required from national experts for estimating costs in their respective country and for aggregation according to CIAM requirements Country specific parameters for estimating variable operating costs (manpower costs, energy costs…) Data for aggregation of results (obtained at a very detailed level (reference installation)) according to the CIAM needs

  13. Specific data required from national experts for estimating costs and for aggregation according to CIAM requirements For each emission source : Total activity level in 2000, 2005, 2010, 2015 and 2020 Respective percentage of the activity level carried out on each reference installation in 2000

  14. Specific data required from national experts for estimating costs and for aggregation according to CIAM requirements In each emission source, for each reference installation • Percentage of use of each reduction technique or • combination of techniques in 2000, 2010 and 2020 due • to current regulation (European and / or national) • Applicability factor of each reduction technique or • combination of reduction techniques Applicability factor (def. CIAM): Maximum potential of use of a technique - defined as a percentage of the activity level

  15. Applicability factor (def. CIAM): Maximum potential of use of a technique - defined as a percentage of the activity level Production of 1,000 tons of a product in the year 2010 There are 3 reference installations Each reference installation has two abatement techniques

  16. Aggregation of data • For one emission source, deliver IIASA with only : • One average cost of a primary or a secondary technique, • or a combination of them • One average percentage of use of a reduction technique in 2000, 2010 and 2020 • One applicability factor of a reduction technique

  17. Aggregation of data Example : aggregation of cost data i : number of reference installations (RI) – i ranges from 1 to x j : number of reduction techniques – j ranges from 1 to y Pi : proportion of the activity carried out in RIi (provided by experts Ci,j : cost of the technique j in RIi (C can represent an investment I, an operation cost OC…) ACj : average cost of the technique j (AC can represent an investment I, an operating cost OC…) x ACj = (  Pi . Ci,j ) / 100 i = 1

  18. Aggregation of data Aggregation made by the computer from data provided by national experts

  19. Some additional information Use of SNAP code with a fourth serie of digits. The fourth serie represents a characteristic sub-activity Example : 06 03 05 Rubber processing 06 03 05 01 : Synthetic rubber goods production (except tyres) 06 03 05 02 : Tyre production Example : 06 04 03 Printing industry 06 04 03 01 : Heatset offset printing 06 04 03 02 : Publication rotogravure 06 04 03 03 : Rotogravure and flexography for packaging 06 04 03 04 : Screen printing