1 / 16

JESUS GUARDADO, LEAH NATION, HUY NGUYEN, TINA RO

JESUS GUARDADO, LEAH NATION, HUY NGUYEN, TINA RO. UPDATE  2/25/2010. Agenda. Project Background Current Progress  Setbacks How that affects us Previous Schedule Updated Gantt Looking ahead. Project Background. Polymeric Photovoltaic Cells Low fabrication costs Light weight Flexible

marshall
Télécharger la présentation

JESUS GUARDADO, LEAH NATION, HUY NGUYEN, TINA RO

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JESUS GUARDADO, LEAH NATION, HUY NGUYEN, TINA RO UPDATE  2/25/2010

  2. Agenda • Project Background • Current Progress  • Setbacks • How that affects us • Previous Schedule • Updated Gantt • Looking ahead

  3. Project Background Polymeric Photovoltaic Cells • Low fabrication costs • Light weight • Flexible Carbon Nanotubes • Aid transfer of electrons • Prevents charge recombination • Improves Voc Illustration of cell FTO - Flouride Tin Oxide PEDOT - Poly(3,4-ethylenedioxythiophene) P3HT - poly(3-hexylthiophene)

  4. Current Progress  Accomplishments: • acquire materials • find workspace • obtain permission to use equipment • modify procedure based on available equipment • create logo • consultations with staff, professors • reserve future equipment

  5. Materials Purchased and Donated     • Carbon nanotubes (CoMoCAT, Aldrich) • P3HT [ poly(3-hexylthiophene) ] (Baldo) • chloroform (Xie) • PEDOT [ poly(3,4-ethylenedioxythiophene) ] (Xie) • FTO [ Fluoride Tin Oxide ] (Xie) http://riekemetals.thomasnet.com/ SWeNT SG 65, from CoMoCAT

  6. Equipment and Labs • Equipment and Lab confirmed for nanotube prep: • 2/25 ISN (Institute for Soldier Nanotechnologies) • Ultrasonicator • Super Speed Centrifuge • wanted: rcf= 164,000g • got: 70,000g • Impact of available equipment:      modify procedure • different ratio P3HT to CNTs • lower PV response nanopharmaceuticals.org

  7. Setbacks and Challenges Setbacks: • Delays in obtaining materials • Primary lab choice: inaccessible • Secondary lab option: inadequate equipment • Long-distance communication issues •   Immediate Challenges: • Securing access to ISN equipment • Adjusting to a changed protocol and schedule http://www.uwyo.edu/EHS/images/jpeg%20images/detour_sign.jpg

  8. Previous Schedule

  9. Updated Schedule

  10. Milestones

  11.  Research

  12. Experiment

  13. Upcoming Tasks: • Create samples: Prepare nanotube materials, prepare mixtures for samples, spin coating • Continue research on future potential of PPCs • Prepare strong final design strategy for next presentation

  14. Summary The harder the conflict, the more glorious the triumph. What we obtain too cheap, we esteem too lightly; it is dearness only that gives everything its value. I love the man that can smile in trouble, that can gather strength from distress and grow brave by reflection. 'Tis the business of little minds to shrink; but he whose heart is firm, and whose conscience approves his conduct, will pursue his principles unto death. -Thomas Paine

  15. Questions?

  16. Acknowledgements • Helen Zeng • Yinlin Xie • Joy Perkinson • Christoph Sachs

More Related