An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October 2010 Astana

  2. Energy Charter Protocol on Energy Efficiency and Related Environmental Aspects Governments of contracting parties: define energy efficiency policy set legal and regulatory frameworks elaborate, implement and update programmes provide appropriate institutional and legal infrastructures cooperate/assist on international level

  3. Energy Efficiency Policy in Kazakhstan Address by the president of the Republic of Kazakhstan, Nursultan Nazarbayev, to the people of Kazakhstan, dated 2 February 2010 ‘A New Decade – a New Economic Growth – New Opportunities for Kazakhstan’. The Address by the president of the Republic of Kazakhstan, Nursultan Nazarbayev, to the people of Kazakhstan, dated 28 January 2011. Order of the Kazakhstan president dated 19 March 2010 ‘On approval of Programme on Accelerated Industrial and Innovative Development of Kazakhstan for 2010 – 2014’.

  4. Energy Efficiency – 2011 Draft laws: On energy saving and energy efficiency improvement On amendments and addenda to certain legislative acts of Kazakhstan regarding energy saving and energy efficiency improvement 2.Draft Comprehensive Energy Efficiency Plan

  5. European Commission Inogate programme: Energy-Saving Initiative in the Building Sector in the Eastern European and Central Asian Countries (ESIB) Capacity Building for Sustainable Energy Regulation in Eastern Europe and Central Asia Support to Kyoto Protocol Implementation Sustainable Energy for Central Asia: Renewable Energy Sources – Energy Efficiency

  6. United Nations Economic Commission for Europe Energy Efficiency – 21: Increasing Energy Efficiency for Secure Energy Supplies Financing Energy Efficiency Investments for Climate Change Mitigation

  7. UN Development Programme/GEF Projects: Energy Efficiency Design and Construction of Residential Buildings Removing Barriers to Energy Efficiency in Municipal Heat and Hot Water Supply UNDP/GEF Project

  8. Commonwealth of Independent States • Agreement on Cooperation among CIS Member States to Secure Energy Efficiency and Energy Saving, dated 7 October 2002 • Decision of the CIS Economic Council dated 11 March 2005,on Key Areas of Cooperation among CIS Member States to Ensure Energy Efficiency and Energy Saving

  9. European Bank for Reconstruction and Development Sustainable Energy Action Plan: • Innovative loan facility to finance energy- efficiency projects • Assistance in drafting laws improving the energy sector legal framework

  10. Kazakhstan Electricity Transmission Rehabilitation Project, Phase II Objective: Improve technical level of equipment at Kazakhstan National Power Grid (NPG) substations, ensure energy efficiency and reliability of Kazakhstan NPG operation through installation of modern high voltage equipment at substations • The Project provides for the following: • Replacement and installation of equipment at 55 substations of Kazakhstan NPG • 500-220 kV power transformers and autotransformers • 35-500 kV instrument transformers • 35-500 kV switching equipment • 6-500 kV surge arresters • 35-500 kV post insulators • Implementation period: 2010-2016 • Cost:KZT 52 billion (€ 255 million from EBRD plus company’s funds)

  11. THANK YOU FOR YOUR ATTENTION!