1 / 18

Potential for Tram in the City of Skopje, Project Introduction

Potential for Tram in the City of Skopje, Project Introduction. Gjorgjievski Kristijan | 13 October 2011. Developments in the past year. December 2010 – The City of Skopje engaged Vialto Consulting and EC Harris as consultants to do the following tasks:

mckile
Télécharger la présentation

Potential for Tram in the City of Skopje, Project Introduction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Potential for Tram in the City of Skopje, Project Introduction Gjorgjievski Kristijan | 13October 2011

  2. Developments in the past year • December 2010 – The City of Skopje engaged Vialto Consulting and EC Harris as consultants to do the following tasks: • Phase I - Preparation of a Study for a concession project for development and introduction of light railway system for passenger transport in the area of the City of Skopje. The study includes: • Traffic - technical analysis • Economic and financial analysis • Legal analysis • Possibilities for development • Phase II - Preparation of Tender Documentation and model contract, evaluation criteria and animation of potential investors; • Phase III – Advisory in the selection process and contracting negotiations

  3. Planned Tram Network(Feasibility Study 2007) Line 1Line 1 alternativesLine 2Line 3Line 4

  4. Estimated Passenger Flow(Peak Hour)

  5. Estimated Tram Passenger Flow „Corridor” approach (change to tram) 80% of bus passengers (80 pax per bus) 20% of car passengers (1,5 pax per car) Daily passengers assumptions w = 15% (peak hour factor) growth factor: 1% per year diameter shaped lines have two branches Yearly passengers assumptions 250 workdays, 115 holidays holiday = 0.5 × workday

  6. Other Analysed Technical Issues Modification of tram stop allocation Track alignment (side or central) Tariff system Bus reorganization

  7. Proposed Versions

  8. Investments and Operational CostVersion 2a - Novo Lisice - Centar - Gjorce Petrov

  9. Investments and Operational CostVersion 2a - Novo Lisice - Centar - Gjorce Petrov

  10. Financial analysis of a possible version • Optimum operative subsidy, with 10% initial investment • 10 % initial investment granting • optimum operative subsidy (to reach at least 11 % interest rate on equity and not to have negative cumulative cash-flow) • no ticket price reduction (except for students and pensioner) Kristijan Gjorgjievski|

  11. The Study - Conclusions • It is financially feasible to introduce the Tram as an environmentaly friendly high capacity transport mode in the City of Skopje; • Among line options investigated, nr 1 proved to be most beneficial and financially feasible (12km long trunk line); • Later further development is possible (line 2, 3); • Sustainable public financing is needed • 10 % initial investment granting • optimal operative subsidy • Risks to be mitigated (cost overrun, time overrun, policy failure, car invasion). • Need for changes in legislation, due to a new way of transport • Additional measures: • Modification of local transport strategy. • Reorganisation of JSP

  12. Next steps • The city of Skopje decided to proceed with the next phase, i.e into project preparatory phase • Animation of possible investors and organizing round table (end of November 2011) • Expected tender announcement – End of January 2012 Kristijan Gjorgjievski|

  13. Questions ?

  14. Thank You for Your Attention! kristijan.gjorgjievski@vialto.hu The study was prepared by Dr. Csaba Orosz, Dr. Janos BERÉNYI Dr. Tibor Princz-Jakovics Dr. Peter Bocz,

  15. Backup slides Kristijan Gjorgjievski|

  16. PPP (DBFM) Structure

  17. Present traffic flow to the centre (morning peak hour)Тековен проток на сообраќајот во центарот car bus 27th of June 2011 17

  18. Public subsidy, Version 2a/4 Negotiationpoint 15th of April 2011

More Related