1 / 8

Verimag@Ametist

Verimag@Ametist. Oded Maler December 2002. Major Work Directions. SAT Solving for Difference Logic Axxom case-study Scheduling with Timed Automata. SAT for Difference Logic.

medea
Télécharger la présentation

Verimag@Ametist

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Verimag@Ametist Oded Maler December 2002

  2. Major Work Directions • SAT Solving for Difference Logic • Axxom case-study • Scheduling with Timed Automata

  3. SAT for Difference Logic • The first prototype of the solver has been implemented (Moez Mahfoudh, collaboration with E. Asarin, M Bozga and P. Niebert (Marseille)) with some translations from TA and other problems. • Expected breakthrough: April 2003 or never..

  4. Axxom Case-Study • Two directions: • Treat the case-study itself – Marius Bozga using IF • Reach it gradually as extending the basic job-shop problem (see later) • Expected results: Mars 2003

  5. Scheduling Framework: Principles • Start with the cleanest problem (job-shop) • Model it with timed automata • Exploit the specific structure of the problem to have better algorithms • Add general- and special-purpose heuristics • Test on benchmarks • Move on to more complex problems • (Thesis of Yasmina Abdeddaim, Nov 2002)

  6. So far it Works! • Job-shop problem (in the VHS project): discovery of the fact that for this problem you do not need the zone technology! • In fact you do not need it in a large class of problems • Investigation of “intelligent” search techniques • Respectable performance results

  7. Extensions • Job-shop with preemption (Ametist kick-off meeting): similar resuls, no zones, undecidability of stopwatch becomes irrelevant, good performance results • Task graph scheduling: partially-ordered tasks on parallel identical machines (with release times and deadlines) – talk by A. Kerbaa this meeting

  8. Further Extensions • Different machines with different speeds for each product – a preparation for the value chain problem (talk by A Kerbaa) • Parallel threads with resources and synchronization (preliminary work) • Non monotonicity (relative deadlines) • Scheduling under uncertainty (my talk)

More Related