Design Workgroup. National Monitoring Network. Introduction. Overview of Progress to Date Al Korndoerfer, Chair of Design Workgroup. Applying Charge from CEQ. 10 Resource Areas Concentrated on first two Environmental Issues Oxygen Depletion Nutrient Enrichment

Télécharger la présentation

Design Workgroup

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Design Workgroup National Monitoring Network

  2. Introduction • Overview of Progress to Date • Al Korndoerfer, Chair of Design Workgroup

  3. Applying Charge from CEQ • 10 Resource Areas • Concentrated on first two Environmental Issues • Oxygen Depletion • Nutrient Enrichment • Developed Geographic Areas of concern • Developed Parameter list from charge & existing programs

  4. Oxygen Depletion • Parameter list, sampling frequency, spatial resolution, probabilistic vs.. Targeted, sampling protocols • See spreadsheet

  5. Nutrient Enrichment • Parameter list, sampling frequency, spatial resolution, probabilistic vs. Targeted, sampling protocols • See spreadsheet

  6. Next Steps • Finalize design of first two environmental issues for all resource areas • Decide whether rivers are to be fully characterized within NMN or only monitored for loading to coastal/estuaries. • Expand concept to remaining environmental issues