1 / 8

Aboveground Storage Tank Enhanced Vapor Recovery Workshop - Fresno, CA April 24, 2003

Aboveground Storage Tank Enhanced Vapor Recovery Workshop - Fresno, CA April 24, 2003. Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board. Workshop Agenda. Welcome and Introductions AST EVR Regulatory Activities & Timeframe

meli
Télécharger la présentation

Aboveground Storage Tank Enhanced Vapor Recovery Workshop - Fresno, CA April 24, 2003

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Aboveground Storage Tank Enhanced Vapor RecoveryWorkshop - Fresno, CAApril 24, 2003 Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board

  2. Workshop Agenda • Welcome and Introductions • AST EVR Regulatory Activities & Timeframe • Certification / Test Procedures • AST Inventory and Emissions • Future Activities • Open Discussion

  3. Vapor Recovery Overview Phase I Phase II

  4. AST EVR Regulatory Activities & Timeframe • AST EVR regulations scheduled for December 2003 Board Hearing. • Proposed text of regulations to be released in October 2003 for comment. • Existing systems expected to be grandfathered through mid-2008.

  5. Certification / Test Procedures • Revised CP-206, April 23, 2003 www.arb.ca.gov/vapor/ast/ast.htm • New System Leak Test Procedure (TP-206.1) and Fugitive Emissions Test Procedure (TP-206.2) will be posted in May for review and comment.

  6. AST Inventory and Emissions • Fuel Carrier Survey • 2,873 Insulated/ Protected • 4,760 Single-Wall • Inventory data will be used for statewide emissions estimate.

  7. Future Activities • Complete Phase I efficiency testing. • Develop Statewide AST Emissions Estimate. • Begin AST EVR rulemaking. • Next AST workshop

  8. Contact Joe Guerrero, Manager Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board P.O. Box 2815 Sacramento, CA 95812 (916) 324-9487 jguerrer@arb.ca.gov www.arb.ca.gov/vapor/ast/ast.htm