1 / 8

CITI

CITI. Status Update for ECC Reporting Project August 20, 2009. ECC Reporting Relief for CITI. #1: Short Term Goal: FMO for ICG Report for Tony DiSanto. Execute Plan – Modify Reports, Remediate Agents 7/30 through 8/5. Report 8/6. Tweaking Reports - 8/11.

merton
Télécharger la présentation

CITI

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CITI Status Update for ECC Reporting Project August 20, 2009

  2. ECC Reporting Relief for CITI #1: Short Term Goal: FMO for ICG Report for Tony DiSanto Execute Plan – Modify Reports, Remediate Agents 7/30 through 8/5 Report 8/6 Tweaking Reports - 8/11 #2: Establish a Repeatable Process to maintain LDT current Continue remediation and document process for maintaining LDT current Already in Process Deliver By 8/31 #3: RCA and Recommendations for Long-Term Stability Document Findings and Recommendations Already in Process Deliver By 9/30 Note: “Deliver by” provides a final delivery date; could be delivered earlier.

  3. Short Term Goal: ICG Business Unit FMO • As of August 3rd, 622 ICG Hosts were identified with Agent discovery problems • These hosts were processed using a batch deletion script provided by Engineering (“Master Agent Restart Script”) • Upgrade 5.2 Agents • Upgrade to 6.0 agents was not possible, CITI policy for uninstall/install is the obstacle • Ran remediation against 5.2 agents • Modify FMO Report developed by Jeff Tang’s group • Additional resources provided by Dave Wallace’s group

  4. Short Term Goal: ICG Business Unit FMO, cont. • Results: • 500 (80% ) ICG Hosts now are reporting current discovery times • 122 (20%) ICG Hosts will require individual remediation by CITI SA’s with EMC • This resulted in an increase of 80TB of storage (tot. capacity is 1.1 PB) • EMC was instructed to focus on ICG only and not the complete 1800 hosts • EMC will continue to work through the 1800 hosts over the following 2-3 weeks • Agents that need to be re-installed will take an extended period of time; reinstallation is CITI’s responsibility and EMC will assist as much as possible while onsite.

  5. Establish a Repeatable Process:Maintain LDT current • Now a site-wide remediation project • 2,257 Hosts Identified with Agent Discovery Problems site wide • Of this 2,257: • 1150 Hosts have been processed using the batch deletion script • Results: • 704 (62%) Hosts are reporting current discoveries after action by EMC • 446 (38%) Hosts will require individual remediation by CITI SA’s with EMC • 1107 Have not been attempted, due to CITI’s own restrictions • Hosts contain database agents and hosts that are determined to be critical

  6. Establish a Repeatable Process:Maintain LDT current, cont. • Process Includes: • Using the Master Agent Restart Script provided to remediate the host • Master Agent Restart Script Handles • MO deletion from CC Repository • MO with multiple domains • AAD DB batch load script • Provides the ability to feed the database discovery information from a file • Allows for bulk processing to discovery DB’s • Document the steps for repeating this process periodically by CITI • Purpose is to extend the short term remedial action • EMC will have up to 2 resources at CITI to continue agent remediation through the remainder of the Hosts as directed by CITI • This team will also work as much as possible with the CITI SA’s to get the Agents reinstalled on the host which can not be restarted.

  7. Long-Term Stability: RCA & Recommendations • EMC to Document Findings and Recommendations • This will cover: • Use Case Analysis • Gap Analysis • RCA (Root Cause Analysis) • Findings will explain why CITI is experiencing Problems • This will be based on the Use Case Analysis, Gap Analysis, and first-hand experience while working issues and interviewing the Cit Dev and OPS staff. • Recommendations will cover • Bugs in ControlCenter • Enhancements to ControlCenter • Changes to CITI operations procedures • Changes to CITI Development

More Related