FRAMEWORK OF RWM, CURRENT & PLANNED ACTIVITIES IN URT S.SAWE TANZANIA ATOMIC ENERGY COMMISSION

REGIONAL WORKSHOP ON WASTE MANAGEMENT AND SAFE DISPOSAL OF RW , TUNIS, TUNISIA 17 – 21 MARCH, 2014. FRAMEWORK OF RWM, CURRENT & PLANNED ACTIVITIES IN URT S.SAWE TANZANIA ATOMIC ENERGY COMMISSION. Sources of radioactive waste in URT. Medical Industries Research Illicit trafficking

mhilbert
Télécharger la présentation

FRAMEWORK OF RWM, CURRENT & PLANNED ACTIVITIES IN URT S.SAWE TANZANIA ATOMIC ENERGY COMMISSION

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. REGIONAL WORKSHOP ON WASTE MANAGEMENT AND SAFE DISPOSAL OF RW , TUNIS, TUNISIA 17 – 21 MARCH, 2014 FRAMEWORK OF RWM, CURRENT & PLANNED ACTIVITIES IN URT S.SAWE TANZANIA ATOMIC ENERGY COMMISSION

  2. Sources of radioactive waste in URT • Medical • Industries • Research • Illicit trafficking • NORM Phosphate mining (ongoing activity) Oil & gas (ongoing activity) Uranium mining (Licensing stage)

  3. RW inventory • (?) Radium needles (used in 1960’s) recovered in 1999 • (?) Caesium-137 industrial radiographic source recovered from a swamp • (?) Cs-137 sources (density gauges) recovered from scrap metals • (?) Stolen source (recovered) • (?) sources from licensed users

  4. RW inventory… • (?) Neutron sources (3.7 GBq each) recovered from a drilling company • (?) Disused Am/Be-241 sources recovered from a road construction companies

  5. Legislations and Regulations for Control of Radioactive Materials • The Protection from Radiation Act No 5 of 1983 • The Radioactive Waste Management Regulations, 1999 • The Atomic Energy Act No. 7 of 2003 • The Protection from Ionizing Regulations, 2004 • The Mining and Milling of Radioactive ore Regulations, 2011 (NORM)

  6. Responsibilities and roles of involved organizations Regulatory body (TAEC) • Maintains an inventory of both used and disused sources countrywide • Assist (when requested) to manage spent sealed sources • Perform regular monitoring (inspection) of both spent and disused sources to ensure safety • Guide operators on how to comply with legal requirements

  7. Responsibilities and roles of involved organizations Licensees • Ensure safety and security of spent source while in their custody • Responsible for final disposal of spent source • Maintain an inventory of both used and disused sources • Record keeping and reporting to the regulatory authority

  8. Responsibilities and roles of involved organizations Customs • Ensure that importers and exporters of radioactive materials (sources) are licensed by the Regulatory Authority

  9. Waste Management • Observed increase of disused sources in 1990’s • Need to establish Temporary Storage Facility became evident • The Temporary Storage Facility used 1999-2005 • Sources from different origins (illicit trafficking incidents, abandoned/stolen, etc) were stored in this facility

  10. Temporary Storage Facility (1999-2005)

  11. The Central Radioactive Waste Management Facility (CRWMF)

  12. CRWMF

  13. Metal drum with source in

  14. Inventories • Inventory of disused sources in the storage Facility • Inventory of sources in Use • Inventory of Disused sources • Inventory of Illicit Trafficking Incidents

  15. Conditioning (2009)

  16. The LTSS Container

  17. CRWMF • Operational since 2005 • Approx. 380 sq. m. • Designed for conditioning and storage • Security Guards on site 24 hrs • Electronic Security Alarms installed • Phone and Radio communication installed

  18. TAEC Policy on Waste Management • Responsibility for disposal of radioactive waste lies with the user/licensee • Licensee to have an Agreement for source(s) to be returned to the Supplier when its useful time is over • Licensee may contract TAEC to collect and manage spent source(s) • User to ensure high degree of safety and security measures when possessing radiation source(s)

  19. Future plans • To Condition the sources in the CRWMF • To Conduct search and secure of orphan sources country wide • To Strengthen capability to combat illicit trafficking of radioactive materials (training, provision of equipment, etc,) • To review regulations on waste management

  20. Future plans… • To collect disused sources from users • To build capacity in Radioactive Waste Management (AFRA, IAEA Projects, etc)

  21. THE END THANK YOU FOR YOUR ATTENTION