1 / 1

T013 Advise board members on DL

T013 Advise board members on DL. DL portion. To DL or not to DL? (decision aid). Familiarize with crse/ tasks/. Expectation Mgmt. EO013.02 Communicate with SME. EO013.03 Identify potential DL media/ method(s). EO013.01 Demonstrate Potential DL options. DL technology.

mick
Télécharger la présentation

T013 Advise board members on DL

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. T013 Advise board members on DL DL portion To DL or not to DL? (decision aid) Familiarize with crse/ tasks/ Expectation Mgmt EO013.02 Communicate with SME EO013.03 Identify potential DL media/ method(s) EO013.01 Demonstrate Potential DL options DL technology DL production Processes/ Timelines DL production media DL production methodology EO013.05 Complete Feasibility Report EO013.04 Select development option TE instructional staff competencies TE throughput considerations Cost Factors & Costing models CF Feasibility Report Policy TE Facility capabilites and limitations Scenario/Sim portion EO013.01 Demonstrate Potential DL options EC EC EC DL technology DL production Processes/ Timelines DL production media DL production methodology EO013.02 Communicate with SME EC Expectation Mgmt Familiarize with crse/ tasks/ To DL or not to DL? (decision aid) EO013.03 Identify potential DL media/ method(s) TE Facility capabilites and limitations TE instructional staff competencies TE throughput considerations Cost Factors & Costing models EC |Guide TPWB on selection process EO013.04 Select development option EC CF Feasibility Report Policy Brief Borad on FA results EC EO013.05 Complete Feasibility Report

More Related