1 / 16

OUTLINE

OUTLINE. ON SOME TIMING JITTER ISSUES FOR THE FERMI  FEL PHOTOINJECTOR LASER SYSTEM Presented by M.B.Danailov Laser Lab, Sincrotrone Trieste danailovm@elettra.trieste.it. Current status of the FERMI project (slides provided by Rene Bakker)

milica
Télécharger la présentation

OUTLINE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OUTLINE ON SOME TIMING JITTER ISSUES FOR THE FERMI  FEL PHOTOINJECTOR LASER SYSTEM Presented by M.B.Danailov Laser Lab, Sincrotrone Trieste danailovm@elettra.trieste.it Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system and related jitter reduction issues ►required parameters ►main concerns ►near future experiments SLAC XFEL Short Bunch Measurement and Timing Workshop

  2. ELETTRA SLAC XFEL Short Bunch Measurement and Timing Workshop

  3. Undulator Building (new) Experimental User Hall (new) 1 GeV Linac (existing) Booster Synchrotron (under construction) Present linac availability: 22 h/day ELETTRA 2-GeV 3rd generation storage-ring (existing) runs presently 3000 h/year, 24 h/day for special studies FERMI@ELETTRA SLAC XFEL Short Bunch Measurement and Timing Workshop

  4. FERMI@ELETTRA • Key features: • Development of a user-facility. • Based on existing 1-GeV S-band linac infrastructure. • Specifications: • Spectral range (2 undulator lines): • 100 – 40 nm  ( 12 – 30 eV): FEL-1 •  40 – 10 nm ( 30 – 124 eV): FEL-2 • Flexible polarization. • Seeded operation (SASE as optional). • Short pulses (sub-ps  < 100 fs RMS). • 50 Hz repetition rate, 1 micro-pulse per macro-pulse. SLAC XFEL Short Bunch Measurement and Timing Workshop

  5. FERMI@ELETTRA • Present status: • Funding granted • Linac serves as injector for ELETTRA • 2005 – 2006: • (available for FERMI : 22 h/day) • Construction of a new full-energy injector (booster) for ELETTRA • Commencement of FEL construction • 2007 ………… • Implementation and use of the linac FEL user-facility SLAC XFEL Short Bunch Measurement and Timing Workshop

  6. Injector new injector accelerator S0 – S7 old injector RF photo-gun accelerator Present Injector by-pass FERMI@ELETTRA SLAC XFEL Short Bunch Measurement and Timing Workshop

  7. bunch compressor 1 bunch compressor 2 new injector S0 S1 – S5 S6 – S7 old injector linac linac linac BC1 BC2 new injector harmonic cavity (new) FERMI@ELETTRA SLAC XFEL Short Bunch Measurement and Timing Workshop

  8. harmonic cavity FEL-1 user stations new rf photo-injector seed linac linac booster accelerator BC2 BC1 seed FEL-2 30 % tunability FERMI@ELETTRA SLAC XFEL Short Bunch Measurement and Timing Workshop

  9. online diagnostics • focused beam • direct unfocussed beam • monochromatized beam FEL synchronized laser spontaneous radiator photo-cathode laser RF P&P lasers Master Oscillator timing diagnostics linac FEL feedback FERMI@ELETTRA SLAC XFEL Short Bunch Measurement and Timing Workshop

  10. FERMI@ELETTRA 2-Stage High Gain Harmonics Generation 250 nm  50 nm  10 nm SLAC XFEL Short Bunch Measurement and Timing Workshop

  11. 20 ms ~ 2.5 ms accelerating field in linac electron pulse e.g., 50 ns (20 MHz) 20 ms ~ 2.5 ms increase of the average brilliance and flux: 40x FERMI@ELETTRA SLAC XFEL Short Bunch Measurement and Timing Workshop

  12. FERMI PHOTOINJECTOR LASER MAIN PARAMETERS Rep rate: 10 (50) Hz Pulse duration: 2-10 ps (FWHM), ideal pulse shape: flat-top Rise-time: 0.5 ps (10-90%) Spatial profile: top-hat, ~ 1mm 1/e2 radius Fundamental Wavelength 780-800 nm UV wavelength (third harmonic) 260-267 nm Pulse energy (for Cu cathode): Compressed IR amplifier output – 6 mJ /10mJ UV after THG crystal- 0.6 mJ/0.75 mJ UV on the photocathode >0.45 mJ /0.5mJ Timing stability with respect to RF : < 0.5/0.3 ps RMS Energy stability : < 4% RMS / <3 %RMS Stability of the beam position on the photocathode : < 3% 1.5%RMS SLAC XFEL Short Bunch Measurement and Timing Workshop

  13. Ampl2 (Multi-pass, 50 Hz) SS THG Stab Pump Laser 2 cr-cor FERMI PHOTOINJECTOR LASERLAYOUT REF Error sig ? Ampl1 (Regen. , 1 KHz) ML Laser PP TS Pump Laser 1 TS: temporal shaping ; PP : pulse picker ; SS – spatial shaping ; Stab – pulse energy stabilization system cr-cor : cross correlator (SFG intensity -> jitter) SLAC XFEL Short Bunch Measurement and Timing Workshop

  14. OSCILLATOR JITTER • CURRENTLY CHARACTERIZED: • 1.Oscillator : • - home made mirror dispersion controlled (MDC) Cr:LiSAF laser • - Ti:S oscillator with prism dispersion control • 2. Phase-locking : Commercial CLX-1100 Timing Stabiliser , based on single band (100 MHz) PL loop , mixer • Performance: <200 fs RMS short term stability in noise protected environment • Increase to few ps in presence of acoustic noise • STRATEGY FOR IMPROVEMENT: • 1.Oscillator: • MDC Ti:S laser • Frequency-doubled Er-doped fiber laser • 2.Phase-locking: • Use of double band-loop (GHz detector working at harmonic of the rep rate) • Digital phase detector based error measurement SLAC XFEL Short Bunch Measurement and Timing Workshop

  15. FERMI BEAM TRANSPORT SYSTEM Low vacuum enclosure ? Relay imaging Grating PSD1 T PSD2 To phase det • Open questions: • Ray tracing of the transport optics (Relay imaging?) • CW pilot beam for fast opt path monitoring • - Low vacuum path between laser hutch and gun Gun SLAC XFEL Short Bunch Measurement and Timing Workshop

  16. SUMMARY • We hope that the stand-by period of FERMI is about to end • Timing and synchronization would be crucial for the system • Near future tasks on the laser side: • ►decision on the femtosecond oscillator type • ► further development of digital phase detector based jitter monitoring • ►study of diode-pumped regenerative amplifier jitter (cross-correlator based jitter measurement) • ► ray tracing of beam transport system • ►layout of overall timing system SLAC XFEL Short Bunch Measurement and Timing Workshop

More Related