1 / 9

Data extraction at various level

Data extraction at various level. Data Extraction – Project Arrow Office. Daily data of various fields of Project Arrow office is monitored at various level with the help of “Data Extraction Tool”- Accounts MIS Postmaster of Project Arrow Office to ensure this tool is installed in his office.

mira
Télécharger la présentation

Data extraction at various level

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Data extraction at various level

  2. Data Extraction – Project Arrow Office • Daily data of various fields of Project Arrow office is monitored at various level with the help of “Data Extraction Tool”- Accounts MIS • Postmaster of Project Arrow Office to ensure this tool is installed in his office

  3. Data Extraction – Three areas • Meghadoot • Account MIS- Project Arrow Office to be configured in 6.5 version • Sanchay post • Speednet • 3.1 version

  4. How Data extraction takes place? • Meghadoot • After “day end” in each application- automatic • Sanchay Post • Exe file to be executed to send data to “data extraction tool” (With latest patch this is not required) • Speednet • Speed post data gets transferred to Postman module from speednet in offices where speednet 3.1 is installed

  5. Project Arrow Data Extraction Fields • Point of Sale • 8 items • Postman Module • 27 items • Treasury • 01 item • Sanchay Post • 22 items

  6. Project Arrow Data Extraction Fields….. • Data will be in encrypted form and this can not be manipulated by any body • Data of Project Arrow Offices is monitored at all level and therefore please ensure that “day end” is performed in all the modules daily • Please ensure “exe” file is executed at the end of the day in Sanchay module

  7. Project Arrow Data Extraction Fields….. • Data extraction is either done after performing day end or scheduled

  8. Accessing other modules at DO/RO/CO/Dte level • eMO • User name dop eMO • Password eMO • ePayment • User name dop • Password ePmt • Speednet MIS • User name dop • Password india

  9. Thank you

More Related