1 / 14

GSECARS Update

GSECARS Update. Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13-BMD (bending magnet end station), 13-BMC (bending magnet side station, commissioning) Techniques available to the scientific community

miyoko
Télécharger la présentation

GSECARS Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GSECARS Update Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13-BMD (bending magnet end station), 13-BMC (bending magnet side station, commissioning) Techniques available to the scientific community Diamond Anvil Cell: energy-dispersive and monochromatic diffraction and spectroscopy Multi-anvil Press: energy-dispersive and monochromatic diffraction and imaging (250 ton and 1000 ton press; acoustics, tomography) Microprobe: mXRF, mXAFS, mCMT, mXRD Microtomography: absorption and edge CMT Surface scattering and spectroscopy: CTR,XSW, reflectivity, GIXAFS. Extended X-ray Absorption Fine Structure (EXAFS) Microcrystal and powder diffraction Inelastic scattering in the DAC Brillouin spectroscopy in the DAC COMPRES 2007 Annual Meeting

  2. GSECARS User Program • GSECARS allocates 100% of available beam time on the basis of reviewed proposals through web-based forms (both GSECARS and APS ratings). • All GSECARS proposals are submitted through the APS General User Program. COMPRES 2007 Annual Meeting

  3. GSECARS Funding • NSF-EAR • Operations funding for FY2007 is $1.81M. Grant was fully funded with increase to $2.05M in FY2008. However, in February we were told to submit flat budget ($1.81M) • Essentially no money for equipment in FY2007 • NSF-Major Research Instrumentation • X-ray optics to complete the 13-BM-C side station ($550K; $88K match; 2004 – 2007) • Another MRI grant to UNLV for single-crystal diffraction in DAC has $225 for CCD detector for GSECARS, received. • COMPRES Infrastructure Projects • CO2 Laser Heating: Postdoc and laser system support • Gas Loading Facility: $118K equipment • Multi-anvil Module Project: $68Kequipment • Johnson Noise Thermometry Project: $36K COMPRES 2007 Annual Meeting

  4. GSECARS Funding (cont) • NSF-Geophysics • Rheology Grand Challenge project recently funded, contains $270K for post-doc and supplies for GSECARS. • DOE – Midscale Instrumentation Proposal • $864K mostly detector-related equipment in main NSF/DOE renewal proposal submitted in Aug. 2006 at request of DOE program manager. • No funds in FY2007. Proposals will be held over for FY2008 when program should be funded. • NSF-EAR Nanoscale Research (NIRT) • Award to U. Alaska (T. Trainor, PI; $1.3M, 2004-2008; $310K subcontract to UofC (P. Eng, PI) supports postdoc COMPRES 2007 Annual Meeting

  5. Canted Undulator UpgradeProposal submitted to APS SAC Dec. 2006, waiting for responseGreatly increases time for high-pressure, microprobe is separated and runs 100% of time

  6. Detector Highlights • MAR-165 CCD detectors (2) • One funded by GSECARS-NSF and second by NSF-MRI UNLV/Dera single-crystal diamond cell grant. • MAR-345 online image plate • GSECARS now has 2, new one funded by GSECARS-NSF • Roper visible light CCDs • 4 new cameras for LVP, tomography, diagnostics COMPRES 2007 Annual Meeting

  7. Detector Highlights • Silicon Drift Diode detectors for energy-dispersive spectroscopy • GSECARS has 4-element detector on 6-month loan from SII under SBIR grant, being used right now. • Second 8-element (?) detector to be funded by grant to Kathy Kitts at NIU. • Pilatus Pixel Array detector • State of the art detector. 500x200 array of 170x170 micron pixels. Each pixel has energy discriminator and 20-bit counter. Can count 2MHz/pixel, more than 200 frames/second. • Revolutionary for surface diffraction. • Could be used for very fast diffraction studies COMPRES 2007 Annual Meeting

  8. Hardware Development Highlights • BM-C Development(interface diffraction and single-crystal diffraction at high pressure): • Mirror tank, vertical focusing mirror installed. • Unfocussed monochromator being used, bender being fabricated. • In commissioning for surface diffraction this week, DAC experiments soon • Proposals in 2008-1 • BM-D Brillouin Spectroscopy Instrument • Upgrade to diamond cell apparatus • COMPRES infrastructure project led by UIUC (J. Bass) • Two cycles now run in “user mode” • Report at this meeting COMPRES 2007 Annual Meeting

  9. Hardware Development Highlights (cont.) • ID-D CO2 heating laser • Being installed in 13-ID-D. Alexei Kuznetsov talk at this meeting. • Gas loading facility for DAC • Gas loading system being built by GSECARS with COMPRES funds, will be available to all high-pressure users at the APS. • Progress report at this meeting. • Multianvil • Tomography • D-DIA30 • Torroidal cell COMPRES 2007 Annual Meeting

  10. Hardware Development Highlights (cont.) • ID-D Diode Laser Upgrade • Fiber laser replacements for YLF heating lasers received and installed. Higher power and stability. 3 fiber lasers received, one will be for offline heating in laser lab, 2 for online use in ID-D. • YLF lasers could be moved to X17 to replace old YAG laser there • Microprobe Stage Upgrade • Sample stage has been upgraded with a second X-Y-θ tier with 10 nm precision equipped with encoders. COMPRES 2007 Annual Meeting

  11. COMPRES 2007 Annual Meeting

  12. B: DIA C: D-DIA D: T-Cup E: T-10 F: Hi-P Tomogr. G: Torroidal cell Multiple LVP Techniques A: T-25 COMPRES 2007 Annual Meeting

  13. GSECARS Personnel News • Przemek Dera began as beamline scientist for the DAC program on June 15. • Norimasa Nishiyama, beamline scientist for the LVP has returned to Japan. • Alexei Kuznetsov, post-doc for CO2 laser heating development; COMPRES and GSECARS funding • Atsushi Kubo, post-doc for DAC • Takeshi Sanehira, post-doc for Johnson noise thermometry project, COMPRES and GSECARS funding. COMPRES 2007 Annual Meeting

  14. GSECARS Near Term Goals • Bring the 13-BM-C station fully online with scientific programs in interface diffraction and single-crystal diffraction at high pressure • Further develop the D-DIA apparatus for deformation experiments in the multi-anvil press • Further develop the high-pressure tomography technique in the multi-anvil press • Expand user program on the Brillouin spectroscopy system in 13-BM-D • Install and commission CO2 laser heating for the DAC in 13-ID-D • Install and commission gas loading system for DAC • If APS SAC approves proposal for simultaneous operation of 13-ID-C and D with canted undulators then submit NSF-MRI proposal for upgrades downstream of shield wall. COMPRES 2007 Annual Meeting