Status Report on Traffic Signal Optimization in the Washington Region

Item #12. Status Report on Traffic Signal Optimization in the Washington Region. Edward D. Jones Prince George’s County DPW&T and Chair, Traffic Signals Subcommittee Transportation Planning Board March 18, 2009. Background.

moesha
Télécharger la présentation

Status Report on Traffic Signal Optimization in the Washington Region

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Item #12 Status Report onTraffic Signal Optimizationin the Washington Region Edward D. Jones Prince George’s County DPW&T and Chair, Traffic Signals Subcommittee Transportation Planning Board March 18, 2009

  2. Background • TPB requested a regional traffic signal optimization status report at the January 28 meeting • Identified as CLRP priority area • Follows from the 2002-2005 signal optimization Transportation Emissions Reduction Measure (TERM)

  3. What Does It Mean for Signals to Be Optimized? • Traffic signals re-timed for optimal performance, considering • traffic loads • cross traffic, left and right turns • pedestrians • Coordination of multiple signals (e.g., downtown areas, corridors)

  4. Optimized Does Not Always Mean Minimal Delay for an Individual Motorist • If there are high traffic volumes / left and right turns / high cross-traffic volumes • If you are traveling in the opposite direction of predominant flow • Ensuring the safety of and sufficient crossing time for pedestrians

  5. How Do We Know that Signals are Optimized? • Engineers do not rely solely on the “raw” computer output • Before and after field observations help verify that the optimization process has been successful • Ongoing field observations and monitoring from the traffic control center are important, with fine-tuning if necessary • These monitoring and spot checks activities, as well as responding to citizen inquiries and complaints, all help ensure the system remains working properly

  6. Survey • TPB staff surveyed transportation agencies by email February and March 2009 • Survey focused on whether signals were optimized or checked within calendar years 2006-2008 • Follows the 3-year engineering rule-of-thumb • Responses reflect >98% of all signals in the region that are subject to optimization • Signals not subject to optimization were not included in the survey (e.g., firehouse emergency signals and pedestrian crosswalk flashers)

  7. Optimization Results (2006-2008) • Approximate total signals in region: 5,400 • Total optimized, checked, or adjusted: 80% • Computer optimized: 56% • Other check or adjustment: 24% • Weighted average (2005 TERM methodology): 68% • Not checked: 18% • No report: 2%

  8. How is the Region Doing on Optimization Compared to 2005? • Weighted average of 68% is the same as in 2005 • However, we are doing better than that may indicate because: • The most critical signals in many cases are being checked and optimized even more frequently than once every 3 years • All agencies (with >50 signals) reported that they had optimized or checked significant numbers of their signals within the reporting period • Anecdotal reports of more resources annually being put into optimization – beneficial if continued

  9. Outlook • Continuing awareness of and commitment to safe and effective signals operations • Effective interagency coordination through the Traffic Signals Subcommittee and other forums • The benefits of providing sufficient resources to ensure good signals operations are widely recognized