1 / 18

MFP – Installation using a Jack up Rig

MFP – Installation using a Jack up Rig. Dr . Sanjaya Pillai, Business Head, GLND India, Aswathy Ezhampakkel, Sr . Naval Architect, GLND Qatar. History.

more
Télécharger la présentation

MFP – Installation using a Jack up Rig

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MFP – Installation using a Jack up Rig Dr. Sanjaya Pillai, Business Head, GLND India, Aswathy Ezhampakkel, Sr. Naval Architect, GLND Qatar

  2. History • October 2006: NDC started operations in Mumbai by opening a project office to execute 4WPP & BCPB2 projects • 1stApril 2008: Noble Denton India Pvt Ltd established • January 2009: ISO 9001 certification awarded to Noble Denton India PvtLtd • April 2009 GL acquired Noble Denton • April 2008-May 2012: NDI executed many warranty projects.

  3. GL Group Business Streams • GL NOBLE DENTON (OIL and GAS) • Advanced Engineering and Consulting • Marine Operations and Consulting • Technical Assurance • Design and Execution • GL MARINE (CLASS) • Classification Society • GL GARRAD HASSAN (RENEWABLES) • Renewables

  4. MFPs -Definition BACKGROUND 1. Production wells on the verge of depletion, Additional wells can be drilled in the near vicinity if some marginal fields are available near the existing facilities. • Existing no. of Production wells is not sufficient to take care of increased flow. Additional wells needed for tapping the resources. • Marginal fields exploitation, Minimum facilities for feasibility considering other factors like cost, grouping of fields etc. • Concept of Minimum Facilities Platforms

  5. MFP - Installation INSTALLATION PERSPECTIVES • Risk during Load-Out, Transportation and Installation • Reconsideration of Design Parameters • Safety during Installation • Size and Weight of the Structure Involved • Installation Methodology - innovative • Identify Marine Procedures • Reasonable risk from Owners/Underwriter’s points of view

  6. Installation – A Case Study INSTALLATION of MFP – A Case Study • Operator – Middle East • Feasibility Study for Installation with a Rig • Additional wells needed for accommodating increased oil flow => adjacent additional platform with Minimum Facilities proposed • Input from various contractors taken during feasibility study • Feasibility Study confirmed after thorough evaluation of feasibility of Installation • GLND developed Installation Procedures and Marine Procedures

  7. Installation – A Case Study INSTALLATION of MFP – A Case Study - Design considerations • Deciding parameters • Rig Capacity of Lift • Rig Reach of Lift • Safety of Existing Platform • Installation Methods • Risk Assessment and Mitigation

  8. Installation – A Case Study INSTALLATION of MFP – A Case Study - Steps • Position the Rig near to the existing platform • Cantilever extended, Install Pin pile • Template loaded, sea-fastened and arrives at the location • Template Lift with Rig, Lowered and Placed on the Bottom • Install Legs(Conductors)/ Work Platforms • Topside Lift after Rigging inspection • Final adjustment using tugger winches • Positioning Levelling and welding the Topside on the legs

  9. MFP – Installation Perspectives Step #1, #2 Position the Rig near to the existing platform, Cantilever extended, Install Pin pile Outreach -45’ Port/Sbd- 14.5’

  10. MFP – Installation Perspectives Step #3 Template loaded, sea-fastened and arrives at the location No welding to the deck (timber)

  11. MFP – Installation Perspectives Step #4 Template Lift with Rig, Lowered and Placed on the Bottom Mooring: Bow -1 Stern - 2

  12. MFP – Installation Perspectives Step #5 Install all other Legs/ Work Platforms Cutting at the desired elevation

  13. MFP – Installation Perspectives Step #6 Topside Lift after Rigging inspection Crash rail Air gap

  14. MFP – Installation Perspectives Step #7 Final adjustment using tuggerwinches Positioning is a delicate job

  15. MFP – Installation Perspectives Step #8 Positioning, Levelling and welding the Topside on the legs

  16. Installation – A Case Study INSTALLATION of MFP – A Case Study - Issues • Rig Limitations – DAF to be considered • Weather during Installation – very important • Positioning of the Rig – rig move and soil assessment • Placing of the Topside simultaneously on conductors/legs • Tugger Line and Lifting Gear – to be designed • Leveling of the Platform – suit to site

  17. Installation – A Case Study SUMMARY • Design Parameters - Reconsideration • Risk Assessment and Risk Mitigation • Installation Methodology – Innovation • Custom made procedures/design

  18. Thank you for your attention! For further information visit www.gl-nobledenton.com

More Related