1 / 22

Non-Toll Budget

Non-Toll Budget. Toll Budget. BORROWING CAPACITY. Initial R6 billion guaranteed funding (SZ bonds) R1 billion N1 loan – separate guarantee R26.91 billion guaranteed funding (HWAY bonds & others) R15 billion – non guaranteed funding (NRA bonds). Total Borrowing capacity = R48.91 billion.

morna
Télécharger la présentation

Non-Toll Budget

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Non-Toll Budget

  2. Toll Budget

  3. BORROWING CAPACITY • Initial R6 billion guaranteed funding (SZ bonds) • R1 billion N1 loan – separate guarantee • R26.91 billion guaranteed funding (HWAY bonds & others) • R15 billion – non guaranteed funding (NRA bonds) Total Borrowing capacity = R48.91 billion

  4. TOTAL DEBT Total Debt: R36.1 billion bonds + R4 billion loans (Oct 2013)

  5. SOCIO-ECONOMIC DEVELOPMENTON SANRAL PROJECTS FOR 2012/13

  6. BEE: PROJECT CONTRIBUTIONCOMMITMENT 2012/13

  7. NON-TOLL AND SANRAL TOLLEmpowerment: Value of Work Performed 2012/13

  8. NON-TOLLJOB CREATION 2012/13

  9. SANRAL TOLLJOB CREATION 2012/13

  10. TRANSFORMATION – Skills Development Overall Empowerment Rating: Level 2 (2009/10) STAFF • Board approved Employment Equity Plan to October 2014 • Bursaries SKILLS DEVELOPMENT • Scholarships • Bursaries • Internships • Funding to universities: Chairs in Pavement/Transport/Maths and Science

  11. SKILLS DEVELOPMENT - Community Outreach • SANRAL’s presence at national career expos and exhibitions • Roadshows at secondary schools – including presentations by community development specialists to schools • Use of the database of the Department of Basic Education • Attendance at university open days

  12. Chair in Transport Planning: University of Cape Town Chair in Pavement Engineering: University of Stellenbosch Support: Tertiary Institutions Best performing learner 2012 – WTTP. Glen Gowie School Polokwane

  13. BURSARIES 70 bursars qualifying in engineering (and a few other) degrees, including post graduate degrees 7 universities SCHOLARSHIPS 179 scholars Grades 10 -12 Across 40 schools In 7 provinces INTERNSHIPS 88 interns training with 57 contractors across the country Skills development

  14. TRANSFORMATION THROUGH PROJECTS CONTRACTORS • SMME Development in Routine Maintenance Contracts • 72% of work to black SMMEs • 8% to other SMMEs • 20% to managing contractor responsible for • Empowerment • Training • Support

  15. TRANSFORMATION CONT’D COMMUNITY DEVELOPMENT PROGRAMME • Community based projects (generally safety related) • Pedestrian bridges • Other bridges • Roads • Economic opportunities in rural areas • Employment of women and youth is targeted • Catalysts for opportunities such as tourism, hospitality industry etc. ROAD SAFETY PROJECTS: At least 12 new projects identified every year

  16. Community Development Projects

  17. PEDESTRIAN MOVEMENT:UGU SIDEWALK Previous Now

  18. SANRAL Road Safety Education and Awareness Programme • SANRAL is taking road safety education back into schools • Pedestrian hazardous locations have been identified for road safety education interventions in schools within a 5 kilometre radius from the national roads • Workshops have been conducted at 397 schools, reaching 712 educators. • Primary objectives of workshops: • To introduce the Road Safety Education Programme to educators. • To provide educators with the relevant learning and teaching support materials. • To facilitate the integration of road safety education into learning areas. • To enable learners to acquire knowledge of road safety related issues so as to participate safely in traffic. • To induce skills for survival and a positive attitude.

  19. CHALLENGES • Making the NDP a reality • Supports user charge • Protects the poor • Opposition to user charge • Delays in project related approvals from water affairs, provinces, environmental affairs etc. • Law enforcement: • Traffic rules • Overloading by hauliers • Driver behaviour – road safety • Reputational risk for SANRAL

  20. CHALLENGES CONTD • Insufficient • funding for timely upgrades and maintenance of the non-toll network • SIP-4 Progress • high-level planning and co-ordination between inter-modal transport and the three spheres of Government

  21. Thank You Nazir Alli FRAUD HOTLINE:0800 204 558 Website: www.sanral.co.za

More Related