LIU-SPS-200 MHz Power Upgrade

LIU-SPS-200 MHz Power Upgrade. SPS point 3 LSS3 rearrangement. SPS 200 MHz RF power: some history. 1990. 1980. 2000. 2010. 2010. The RF-SPS started up in 1976 with two accelerating cavities (technical specs were written in 1971)

Télécharger la présentation

LIU-SPS-200 MHz Power Upgrade

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LIU-SPS-200 MHz Power Upgrade SPS point 3 LSS3 rearrangement Eric Montesinos / CERN-BE-RF-SR

  2. SPS 200 MHz RF power: some history 1990 1980 2000 2010 2010 • The RF-SPS started up in 1976 with two accelerating cavities (technical specs were written in 1971) • For the new role of the SPS as proton-antiproton collider, since 1980, there are four cavities operating @ 200 MHz in the SPS 1970 1976 TWC#1 / TX1 TWC#2 / TX2 1980 TWC#1 / TX1+TX2 TWC#2 / TX3+TX4 TWC#3 / TX5+TX6 TWC#4 / TX7+TX8 Configuration of one of the four 200 MHz power plant 1 mW 1 MW Coaxial transmission line 125 to 160 meters RF amplifier Accelerating cavity Eric Montesinos / CERN-BE-RF-SR

  3. Sections and Cavity One section : 11 drift tubes A cavity is composed of sections of cavity One 4 sections cavity Eric Montesinos / CERN-BE-RF-SR

  4. Cavities redistribution 2011 : 4 cavities 2 x 4 sections 2 x 5 sections + 3 spare sections 2018 : 6 cavities 2 x 4 sections 4 x 3 sections + 1 spare section Eric Montesinos / CERN-BE-RF-SR

  5. New RF power plant • Amplifier study • Tunnel integration • New RF Building New RF Building 1 mW 1.7 MW RF amplifier Coaxial transmission line 125 to 160 meters 1 mW 1.7 MW RF amplifier Accelerating cavity Accelerating cavity Eric Montesinos / CERN-BE-RF-SR

  6. LSS3 (1999) Eric Montesinos / CERN-BE-RF-SR

  7. Cavities re-arrangement Straight section • It will be a challenge to re-arrange the whole area • 8 cavities in 4 sectors : 6 TWC200 + 2 TWC800 • 2 x 3 sections cavities fit in a sector • 1 x 4 sections cavities + 1 x TWC800 • Re-use of the ex-SWC sectors (314-321) to re-arrange the pickups (and the dampers ?) 317 314 315 316 318 319 320 321 317 314 315 316 318 319 320 321 Eric Montesinos / CERN-BE-RF-SR

  8. Cavities re-arrangement • Due to a realignment campaign, we already disassembled all the cavities between 2001 and 2004 • We know all the specific needed components, tooling, transport system • We also checked the coaxial lines distribution: difficult, but possible Eric Montesinos / CERN-BE-RF-SR

  9. 2011 Eric Montesinos / CERN-BE-RF-SR

  10. ? 3 3 800 MHz 4 ? 3 3 800 MHz 4 2018 Eric Montesinos / CERN-BE-RF-SR

  11. Eric Montesinos / CERN-BE-RF-SR

  12. Item identification We have listed all items, with their mechanical length, optic, specific position. We miss information -> to be done Eric Montesinos / CERN-BE-RF-SR

  13. Draft schedule Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 2011 2012 2013 2018 2014 2015 2016 2017 Cavity re-arrangement within a LS ( > 6 months) RF : Studies Tendering MS Build new hardware Install Tunnel : Studies Commissioning Build New hardware Installation phase 1 (pickups + dampers) Installation phase 2 (cavities) Building : Studies Authorizations Building Services Eric Montesinos / CERN-BE-RF-SR

  14. Persons in charge • BE-RF : Eric, Thomas, Wolfgang • Integration : Frédéric • CV : Michel • EN : Guillaume, Christophe • VAC : Paolo • Transport : Pascal, Serge • Survey : Patrick • Optic : Yannis • BI : Christian • Safety : Guillaume Eric Montesinos / CERN-BE-RF-SR

  15. Next meeting • Identify all owners • fill in excel table (please by end of next week) • Is there any strong showstopper ? • Optic • Vacuum • Cooling • Cabling • Transport • Safety • Can LSS3 host Dampers ? • Vacuum re-sectorization • New vacuum valves • Vacuum pumps under cavities : new model ? • List all work to be done during LS1 (=12 months ~ 2013) Eric Montesinos / CERN-BE-RF-SR