Switching to an alternative fuel source - Case study on installation of a Biomass Boiler

Switching to an alternative fuel source - Case study on installation of a Biomass Boiler. Jim Kelly, Maintenance Manager, Centocor Biologics (Ireland). Centocor Biologics (Ireland) - History. Part of Johnson and Johnson since 1999. Cork site chosen as Green field Biotech site.

nami
Télécharger la présentation

Switching to an alternative fuel source - Case study on installation of a Biomass Boiler

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Switching to an alternative fuel source - Case study on installation of a Biomass Boiler Jim Kelly, Maintenance Manager, Centocor Biologics (Ireland)

  2. Centocor Biologics (Ireland) - History • Part of Johnson and Johnson since 1999. • Cork site chosen as Green field Biotech site. • Capable of manufacturing medicines for rheumatoid arthritis, Crohns disease and psoriasis. • 2004. Engineering design • 2005. Construction • 2006. Commissioning • 2007. Equipment Validation • 2008. Engineering runs, Consistency lots • 2009. Process Validation and IMB licence • 2010. FDA approval.

  3. Site layout • 5 buildings covering 25,000 sqm. • Manufacturing • Warehouse • Labs and Admin • Central Utilities Plant (CUP) • Waste water treatment plant • CUP • Utility generation • Plant Steam • Chilled water • Compressed air • WFI • Clean Steam

  4. Steam usage • Two 12 tonne, 8.5 bar gas fired boilers. • Burning approximately 17 GWhrs of gas per year. • Steam demand varying from 2 to 5 tonnes/hr. • Annual CO2 emissions of 3100 tonnes. • Main steam users • WFI generation • Clean steam generation • Heating hot water for space heating

  5. Existing Gas boilers

  6. Reasons for choosing Biomass • Main driver for project – carbon neutral. • Carbon emitted from boiler cancelled out by carbon absorbed by trees that are used for woodchip. • Second driver was fuel cost, wood is cheaper than gas – up to 15% savings have been achieved.

  7. Project Summary • Project budget - €2.5M • Project duration - 5 months • Project Managers – Sisk • Payback – 10 years

  8. Boilerhouse

  9. Boiler details • Manufactured by Binder, AG, Austria. • Have 3000 boilers worldwide. • 2.1MW, 2.5 tonne/hr, 8.5 bar output. • Efficiency 87-90%. • Fuel must be <= 50% moisture will go out. • S02 150 mg/m3. • NOx 250 mg/m3 . • CO 150 mg/m3. • Total Particulate matter 50 mg/m3. • TOC < 5 mg/m3. • Ash 1% of fuel volume. 0.8 m3 / day.

  10. Boiler design • Moving floor design, similar to old fashioned chain grate coal boilers. • Ash removed by cyclone on boiler exhaust, also removed by auger at the end of the moving floor. • Hot gas recirc used to clean boiler. • Glosfume filtration unit downstream of boiler for removing particulates.

  11. Boiler front

  12. Boiler rear

  13. Woodchip Supply Contract • Supply contract with Natural Power Systems (NPS), Waterford. • Supply woodchip to G100 standard at < 50% moisture. • Range has been 36% to 50%. • 24/7 supply maintained. • Cost of woodchip based on Steam consumption of boiler. • Fixed price for kWhr output of boiler. • Ash removal once per week, two 200 litre drums per week.

  14. Woodchip containers • Four specially adapted 40 foot containers. • Moving floor, hydraulically driven. • Feed into auger supply system that feeds boiler. • Each container carries up to 18 tonnes of woodchip. • Delivery every 1.5 days, from Fermoy 25 miles away. • Wood from Munster. • Best results when wood is left to dry for 4 months, moisture will drop from 60% to 36%.

  15. Container delivery

  16. Container docked in position

  17. Container hydraulic ram

  18. Glosfume exhaust gas filter unit • Exhaust gas particulates filtered by a Glosfume filter. • Particulates filtered down to 0.1um. • Particulates removed by banks of ceramic filters elements.

  19. Glosfume exhaust gas filter unit