1 / 16

Welfare: Consumer and Producer Surplus and Internal Rate of Return

Welfare: Consumer and Producer Surplus and Internal Rate of Return. Daniel Mason-D’Croz Sherman Robinson. Welfare Analysis. We need to compute benefits and costs associated with policy choices Benefits and costs occur over long time periods

nantai
Télécharger la présentation

Welfare: Consumer and Producer Surplus and Internal Rate of Return

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Welfare: Consumer and Producer Surplus and Internal Rate of Return Daniel Mason-D’Croz Sherman Robinson

  2. Welfare Analysis • We need to compute benefits and costs associated with policy choices • Benefits and costs occur over long time periods • “Discounting” to compute present value of a time stream of benefits and costs • “Social” versus “market” benefits and costs • Externalities and non-market costs and benefits • We will focus on direct and indirect, measurable, costs and benefits

  3. Benefits: Consumer Surplus • Measurable gains to demanders from changes in supplies of goods due to projects • Idea of “Consumer Surplus” (CS): the total amount demanders would be willing to pay for a given amount of commodities • Changes in CS across all markets affected by a “project” measure the benefits attributable to that project • Direct and indirect effects

  4. Benefits: Producer Surplus • Producer surplus measures the net benefits to producers from a “project”: the change in total revenue minus the change in total costs of production of all producers • Direct and indirect effects • The sum of changes in Consumer and Producer Surplus measures the total benefits arising from a project

  5. Costs • Total costs associated with a project include both the direct costs of the “project” (e.g., developing a new seed variety) and the indirect impact on costs of linked producers • We will measure only the “direct” financial costs associated with a project • Changes in costs of linked sectors will be captured by changes in producer surplus, which are measured from the net benefit side.

  6. Consumer Surplus

  7. “Virtual” Supply Curves • Need to generate a “virtual” supply curve, given yield and land area equations • “Virtual” because it is not generated from a fully specified cost function • Yield and area are both functions of producer prices, with constant elasticities • Supply elasticity is the sum of these two elasticities • Constant is the product of the two constants

  8. Producer Surplus

  9. Producer Surplus • We need to find the area under a non-linear, constant-elasticity supply curve. • After some algebra, that area is equal to: • Which is equal to total revenue times 1 over 1 + the elasticity of supply.

  10. Benefit-Cost Analysis • Can use CS and PS to measure benefits of introducing some change such as a new technology • Need to discount CS and PS over time and compute net present value (NPV) of benefits • Need cost data over time to compute NPV of costs

  11. Net Present Values

  12. Net Present Values

  13. Benefit-Cost and Internal Rate of Return

  14. Internal Rate of Return • IRR calculation is done by using the GAMS solver to find a solution to the equation • If NPV of costs exceeds NPV of benefits, the IRR does not exist • We check for this condition and do not try to solve for the IRR in this case

  15. Technology Adoption and Costs • Technology Adoption Pathway Module • Pre-processing module the creates data to be read in by IMPACT food module • Allows users to specify regions, and timing for technology adoption • Critical to test several adoption scenarios, to inform ex-ante analysis of different technologies

  16. Technology Adoption and Costs • Costs are currently exogenous and supplied by the users • Technology adoption costs comes in 3 forms: • Global Costs: Not tied to a specific country (e.g. CG-center investments) • National R&D Costs: Costs incurred at the country level to develop and implement a technology (e.g. National Research centers) • Extension Costs: Costs incurred at country level to implement a technology in the field • Multiple cost scenarios should be used to test cost sensitivity in the benefit-cost analysis

More Related