An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IQA Implementation As-Is Status May, 2009 Jed Heyes

  2. As-Is Status – Field Work Complete

  3. As-Is Status – Where Are We? • As-Is implementation field work 100% complete 4/30/09 • Cleanup mode • Corrective Actions being reviewed and approved

  4. As-Is Status – Focus on CAPs

  5. As-Is Status – Next Steps • Corrective Action Plan being generated for delivery to DOE 6/15/09 • As-Is Final Reporting • D/S/C finalizing individual reports • Site-wide roll-up • Review and reconcilliation of DOE 2006 QA Audit • Report on four risk areas (Document Control, Training, Item Control, and M&TE)

  6. As-Is Status – Process Summary

  7. As-Is Status – Preliminary CAP Summary

  8. As-Is Status – Assurance Council Role • AC attention required to abate systemic risk posed by site-wide issues • Elevated CAP process • QARs/QAEs review all CAPs; propose elevation • CAP temporarily assigned to OQBP as AC Secretary • CAP brought to AC through the Chair • Chair decides whether they warrant AC attention • Chair assigns responsible organization and person • Chair brings CAPs to next AC for concurrence with assigned actions • OQBP places in IMS for tracking

  9. Questions? As-Is Status – Questions