WQD PROPOSED RULE CHANGES

WQD PROPOSED RULE CHANGES. SUMMARY OF CHANGES BY RULE DECEMBER 15 TH AND 16 TH , 2010. Chapter 606 - OPDES Standards. Increase annual fees Establish application fees Define Categorical Industries Allow electronic submittal of DMRs if EPA guidelines are met

nariko
Télécharger la présentation

WQD PROPOSED RULE CHANGES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WQD PROPOSED RULE CHANGES SUMMARY OF CHANGES BY RULE DECEMBER 15TH AND 16TH, 2010

  2. Chapter 606 - OPDES Standards • Increase annual fees • Establish application fees • Define Categorical Industries • Allow electronic submittal of DMRs if EPA guidelines are met • Application requires additional information from facilities which generate or land apply biosolids in the watershed of an Outstanding Resource Water • Establish control testing and stream monitoring requirements for industrial discharging facilities with permit limits for oxygen demanding substances (similar to municipal wastewater discharging facilities) • Updates incorporation by reference of Federal Regulations to July 1, 2010

  3. Chapter 611 – General Water Quality • Establish application fees for certifications required to be issued by the State pursuant to Section 401 of the Clean Water Act • Incorporate Consumer Price Index to adjust these fees as adopted in other chapters • Updates incorporation by reference of Federal Regulations to July 1, 2010

  4. Chapter 616 – Industrial Wastewater Systems • Increase annual fees for industrial tank systems, surface impoundments, and land application systems • Make annual fees applicable to all industrial wastewater systems • Establish application fees for industrial tank systems, surface impoundments, and land application systems

  5. Chapter 621 – Non-Industrial Discharging and Public Water Supply Lagoons including Land Application • Replace the words “Flow-Through” with “Discharging” and “Impoundments” with “Lagoons” • Implement Senate Bill 1695 which effectively eliminated one of the three current scenarios for ownership (i.e., homeowners’ associations) of an individual or small public sewage treatment system • Remove references to total retention lagoons which are now covered in Chapter 619 • No change to existing fee schedule, however, DEQ will begin collecting these fees

  6. Chapter 623 – Pretreatment for Central Treatment Trusts • Establish a fee for the review and issuance of permits that discharge to a Central Treatment Trust (Oklahoma Ordnance Works Authority) • Incorporate Consumer Price Index to adjust these fees as adopted in other chapters • Updates incorporation by reference of Federal Regulations to July 1, 2010

  7. Chapter 626 – Public Water Supply Construction Standards • Increase permitting fees for public water supply construction permits • Provide additional options in obtaining variances • Make variance requirements for this Chapter and Chapter 656 consistent

  8. Chapter 631 – Public Water Supply Operation • Modify annual fees for public water supply systems • Updates incorporation by reference of Federal Regulations to July 1, 2010

  9. Chapter 656 – Water Pollution Control Facility Construction Standards • Increase permitting fees for municipal wastewater construction permits • Limit who is eligible to obtain a wastewater construction permit in accordance with new legislation • Require information contained in engineering reports to match Funding Agency Coordinating Team (FACT) requirements to aid in obtaining permits and obtaining public funds for construction of projects • Provide additional options in obtaining variances • Make variance requirements for this Chapter and Chapter 626 consistent • Allow any ASTM approved material to be used for manholes

  10. Chapter 656 – Water Pollution Control Facility Construction Standards (continued) • Establish additional criteria for emergency operations at WW treatment facilities, in the event of power outage • Require disinfection from aerated lagoon systems that discharge to designated “Primary Body Contact Recreational” or “Public or Private Water Supply” water body • Require written certification on lagoon seal • Require grit chambers on all mechanical wastewater treatment plants • Establish requirement for vortex-type grit chambers • Require the addition of chemicals if necessary to raise alkalinity to facilitate nitrification for ammonia removal • Limit when a Rotating Biological Contactor may be installed

  11. Chapter 656 – Water Pollution Control Facility Construction Standards (continued) • Require the minimum side water depth of a primary clarifier to be 12 feet • Require specific temperatures to be maintained during sludge decomposition • Allow the use of sludge dewatering boxes • Revoke the rules concerning ozone disinfection • Establish requirements for flocculation and filters • Restrict land applications sites to locations with slopes of 5% or less • Reserve a new Subchapter for wastewater reuse • Create Appendix E which contains an updated County Rainfall Table

  12. Chapter 690 – Water Quality Standards Implementation • Establish Appendix B as a list of required minimum quantifiable levels • Establish that facilities with Whole Effluent Toxicity (WET) Limits that have a WET testing failure are now required to pass three consecutive retests within a six-month period or the Department may take further action • Establish that WET retests cannot substitute for regularly scheduled WET testing • Establish that if a permittee has a lethal or sublethal test failure, then WET testing will continue once per quarter for the life of the permit • Establish that WET biomonitoring frequencies cannot be reduced during the first permit cycle

  13. Chapter 690 – Water Quality Standards Implementation (continued) • Allow DEQ to use site specific data to produce a more accurate model • Establish secondary body contact recreational parameters upon primary body contact recreational waterbodies during winter months • Require industries with permit limits for oxygen demanding substances to conduct control tests at the same rate as currently established for municipalities • Require both municipalities and industries to report appropriate control tests in accordance with federal regulations • Updates incorporation by reference of Federal Regulations to July 1, 2010

  14. Chapter 710 – WATERWORKS AND WASTEWATER WORKS OPERATOR CERTIFICATION • Define “associated training class” and “DEQ proctored exam” • Clarify information required on application forms and to clarify when exams must be taken • Require four hours of renewal training • Revise the Certification Fee Schedule • Clarify when application fees are forfeited • Clarify when examinations can be taken • Require that other persons who perform daily operational duties hold water works and wastewater works certifications