An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Outline • detailed operations • Model 04-02 • Model 04-03 • Model 04-04 • general usage of ARENA

  2. Part A Process A EXPO(5) Tria(1,4,8) Rework 9% Part B 91% Process B Batches of 4 EXPO(30) Shipped Tria(3,5,10) Electronic Assembly/Test System Scrapped Part A TRIA(1,3,4) Part B WEIB (2.5, 5.3) 20% 80% EXPO(45) Salvaged & Shipped Sealer

  3. Models • Model 4.1: basic • Model 4.2: resource schedule, resource failure, frequency – time persistence statistics • Model 4.3: changing animation queue, changing entity picture, adding resource picture, adding variables and plots • Model 4.4: using modules in Advanced Transfer

  4. Model 04-01 • ignore details • the 2-minute traveling times • the working hours of stations • schedule of the re-workers • failure of the sealer • the number of racks used

  5. Model 04.02

  6. New Features of Model 04-02: Refinements of Model 04-01 • run length 10 days, 16 hours per day • two 8 hr shifts / day • 1 re-worker in the first shift • 2 re-workers in the second shift • sealer may break down • life time expo(120) • repair time expo(4) • statistics of the status of sealer: on and off • statistics of the rework queue (distribution of # of racks) • each rack possible to hold 10 items

  7. Schedule of the Rework Station • define schedule of re-workers (Schedule module) • associate the schedule with the (resource of the) re-work station • option on resource when a service is interrupted: ignore, wait, preempt • modify the # of hours per day to suit the schedule

  8. Failure of Resource • define a failure (Failuremodule in Advanced Processes) • associate the failure with a resource • the treatment of incomplete work at a failure • same as schedule: ignore, wait, and preempt

  9. Collect Statistics • to get time-in-system statistics of a type of entities (customer-average statistics) • use Record module • record exit time - creation time • compile statistics • to get time-persistent statisticsof a collection of values of variables or a collection of states of resources • use Statisticsmodule (in Advance Process Template) • may need to self-define categories

  10. Statistics for Racks and for Sealers • time-persistent statistics –Statistics module • statistics on sealer status • fraction of idle, failed, and busy time of sealer • statistics on number of racks needed • fractions of time for different number of racks used

  11. Model 04.03

  12. New Features of Model 04-03: Refinements of Model 04-02 • animation of queues • length and points of queues • changing entity pictures • creating new one: copy, edit, and assign entity picture • adding resource pictures • creating resource picture from animation tool bar • adding variable plots

  13. Model 04.04

  14. New Features of Model 04-04: Refinements of Model 04-03 • saving connection links by station and route modules • stations: module for program and icon for animation • route: module for program and icon for animation • changing an entity picture

  15. Yield Management • C = capacity of plane, 100 • Q = # of reservations allowed • X = actual # of passengers appear • ~ Binomial (Q, 0.95) • V= net profit • = 1600X – 40000 – 180 min(X, C)- 2500 max(X-C, 0) • result: Q* = 106