1 / 16

Building for Learning Project Photo Progress Report 4 November 2009 – December 2009

Building for Learning Project Photo Progress Report 4 November 2009 – December 2009 Project commencement 21 st September 2009. AWCC Chairperson Kerryn Dwyer-Parish with Graeme Connelly undertaking site inspections. Kerryn braved the situation – high heels and all.

neveah
Télécharger la présentation

Building for Learning Project Photo Progress Report 4 November 2009 – December 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Building for Learning Project Photo Progress Report 4 November 2009 – December 2009 Project commencement 21st September 2009

  2. AWCC Chairperson Kerryn Dwyer-Parish with Graeme Connelly undertaking site inspections Kerryn braved the situation – high heels and all

  3. The 65mm of rain made for 4 ‘internal swimming pools’ but the task is completed

  4. And no photographic record is complete without some ‘rabbit ears’

  5. November Internal Refurbishments continue

  6. Internal Refurbishments Administration Area

  7. New ceilings, plaster, office and painting

  8. Key workers without who the job could not be done.

  9. December new on-site substation for power required.

  10. December – carpet, ceilings and windows in modernised Administration area

  11. December – steel, bond deck arrives for 1st Floor

  12. December – underground cable boring and concrete footings for stairways and elevator

  13. December – Company Directors tour with Graeme Connelly – girls were happy, boys were serious. L-R. Chairperson Kerryn Dwyer-Parish, Director Jan Wyatt-Brown, Director Alison Mitchell, Corporate Services Manager Pauline Butler, Builder Graeme Connelly, Director Rod Jones, Director David Ryan.

  14. December – bracing underneath bond deck and steel ready for concrete floor above

  15. Final preparations and then concrete pour starting 6am, 22nd December – 150 tonne concrete

  16. 22nd December – 11 truck loads of concrete

More Related