An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project: IEEE P802.15 Working Group for Wireless Personal Area Networks(WPANs) Submission Title:TG4m 4TV Closing Report for March 2012 Date Submitted: 15 March 2012 Source:Sangsung. Choi(ETRI) Contact: Sangsung. Choi(ETRI) Voice: +82 42 860 6831, E-Mail: sschoi@etri.re.kr Re:TG4m Closing Report for March 2012 , Hawaii Meeting Abstract: Closing Report for TG4m Session in Hawaii Purpose: TV White SpaceAmendment to IEEE 802.15.4 Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. Slide 1 Sangsung Choi(ETRI)

  2. Meeting Goal This Week • Review and discuss Technical Guidance Document(TGD) and finalize it. • Hear presentations • Discuss future efforts and next steps Sangsung Choi(ETRI)

  3. Meeting Slots Slide 3 Sangsung Choi(ETRI)

  4. TG4m Closing Report(1) • Heard 4 Technical presentations • Link Budget for 802.15.4m, EldadZeira (InterDigital) ,15-12- 0112-01-004m • Delay Spreads for TG4m Multipath Channel Models, SangsungChoi(ETRI) & Soo-Young Chang(CSUS), 15-12-0137-00-004m • Considerations for Position Location in TG4m, Ben Rolfe(Blind Creek Associates), Cristina Seiber(Silver Spring Networks), George Flammer(Silver Spring Networks), 15-12-0167-00-004m • Impact of power spectral density limit in TVWS, Shigenobu Sasaki and Takuya Inoko (Niigata University), 15-12-177-01-004m Sangsung Choi(ETRI)

  5. TG4m Closing Report(2) • Completed Technical Guidance Document (TGD) (Document 15-11-0684-12) - Motion 1: TG4m approval for TGD to help proposers prepare the proposals. • Call for Proposals - Motion 2: empower the TG4m Chair to issue a Call for Intent and the Call for Proposals . Preliminary Proposals: May 7, 2012 . Final Proposal: July 9, 2012 . Present all Proposals: July meeting(San Diego) Sangsung Choi(ETRI)

  6. MOTIONS FOR TG4m • Motion 1: request that the document, 15-11-0684-12, be approved as the TG4m Technical Guidance Document by the TG4m group to help proposers prepare the proposals. Moved by: Soo-Young Chang Seconded by: ASTRIN Yes: 12 No: 0 Abstain: 0

  7. MOTIONS FOR TG4m • Motion 2: empower the TG4m Chair to issue a Call for Intent and the Call for Proposals described in the document, 15-12-0170-01, to solicit the proposals through WG15 and TG4m email reflectors. Moved by: Soo-Young Chang Seconded by: Jon Adams Yes: 12 No: 0 Abstain: 0

  8. Future Plan/Timeline(1) • Form a New Task Group • - Affirm new officers for TG4m September ,2011 • - Prepare TGD November, 2011 • - Completed TGD March, 2012 • Proposal Effort • - Preliminary Proposals May, 7 2012 • - Final Proposals July 9, 2012 • - Proposal Presentations July , 2012 • - Merge Proposal September, 2012 • - Adopt Baseline November 2012 Slide 8 Sangsung Choi(ETRI)

  9. Future Plan/Timeline(2) • Drafting • - Preliminary draft March 2013 • - Final draft (ready for WG Letter Ballot) July 2013 • Balloting • - Letter ballot September 2013 • - Recirculation November 2013, January, March 2014 • - Sponsor ballot May 2014 Slide 9 Sangsung Choi(ETRI)