1 / 5

Action Items

Action Items. UCI ANITA Collaboration Meeting 9 April 2005. 1. Investigate third RF cable company J. Link Wiring/Interface Plan J. Link, G. Varner Plan to test shielding of Kurt’s sensors; David’s external housekeeping wiring; RFCM power wiring D. Goldstein,

nile
Télécharger la présentation

Action Items

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Action Items UCI ANITA Collaboration Meeting 9 April 2005

  2. 1. Investigate third RF cable company • J. Link • Wiring/Interface Plan • J. Link, G. Varner • Plan to test shielding of Kurt’s sensors; David’s • external housekeeping wiring; RFCM power wiring • D. Goldstein, • Discuss gondola certification in Palestine • M. Rosen • Final nadir decision • P. Gorham • Updated power estimate • J. Link • Updated mass estimate • K. Liewer (?)

  3. For TV—check max. Temp. for crate components • J. Link • When will QRH antennas be ready? • Peter, Jason • Ask NSBF about solar array integration • Marc • Investigate possibility of SLAC test (Spring ’06?) • Peter • Plan for antenna calibration considering delivery • schedule (1st 8 horns arrive in May; others not ordered) • Ped • How to get extra digit in GPS data • Saltzberg, Liewer • RF calibration/operations test in Ft. Sumner • D. Saltzberg, S. Barwick, P. Gorham

  4. 15. Borehole at Willy field S. Barwick, 16. Mounting plan for GPS antennas Marc, Mike D. 17. Mounting plan for RFCM Marc 18. Which antennas to use for veto; testing and placement of vetos on instrument Peter 19. Ask NSBF about use of rotator during EM, full flights (can we point the instrument?) Jason 20. Finalize mechanical parts labeling scheme Marc 21. Extend UCI housing to August 1 Steve

  5. 22. Email dσ/dy distribution functions; investigate existence of updated versions D. Seckel (done!)

More Related