1 / 10

Project # 1 Rikoti-Zestaponi Highway

Project # 1 Rikoti-Zestaponi Highway. May, 2011. Rikoti-Zestaponi Highway. Russia. Kutaisi. Rikoti. Poti. Tbilisi. Black Sea. Lagodekhi. Zestaponi. Batumi. Azerbaijan. Sarpi. Red bridge. Vale. Sadakhlo. Turkey. Guguti. Armenia. Rikoti-Zestaponi Highway.

norris
Télécharger la présentation

Project # 1 Rikoti-Zestaponi Highway

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project # 1Rikoti-Zestaponi Highway May, 2011

  2. Rikoti-Zestaponi Highway Russia Kutaisi Rikoti Poti Tbilisi Black Sea Lagodekhi Zestaponi Batumi Azerbaijan Sarpi Red bridge Vale Sadakhlo Turkey Guguti Armenia Ministry of Regional Development & Infrastructure of Georgia

  3. Rikoti-Zestaponi Highway • Road section located on Poti-Tbilisi-Red Bridge road (part of TRACECA) in the Imereti region, connecting western and eastern regions, ensuring transit traffic via Georgia to/from Turkey, Azerbaijan and Armenia. This road section sill ensure connectivity with the Black Sea Ports (Poti Sea Port, Batumi Sea Port) and notable impacts on Inter-modality of the region. Project Description (Regional Criteria) TRACECA route - Tbilisi-Senaki-Leselidze international road Directly Interconnects – 4 countries (Georgia, Turkey, Armenia, Azerbaijan) Suggested project is the to upgrade existing road from 2 lines to 4 lines and construction new road on some sections. Ministry of Regional Development & Infrastructure of Georgia

  4. Project’s Technical Characteristics Widening (upgrading) Highway from 2 lane to 4 lane • Total Length – 49 km • Existing Capacity – 7 000 vehicles per day • Artificial Constructions (in accordance with the Feasibility Study) • Bridges – 5695 m • Tunnel – 5115 m • Transport Nodes – 11 unit • Existing Lanes – 2 • Lanes After Construction – 4 Ministry of Regional Development & Infrastructure of Georgia

  5. Technical Characteristics Daily Traffic Ministry of Regional Development & Infrastructure of Georgia

  6. Road Safety • Marking and Signaling in accordance with international standards Project implementation is part of Georgian National Traffic Safety Strategy Can ensure high road capacity No traffic jams Ministry of Regional Development & Infrastructure of Georgia

  7. Economic Criteria Feasibility Study – has been done Investment Volume – 340 million USD Ministry of Regional Development & Infrastructure of Georgia

  8. Preliminary Environmental Assessment • Infrastructure Environmental Effect is – minimal • Impact on Pollution is – minimal • Impact on Noise is – low • Emission due to traffic will be sensible reduced Ministry of Regional Development & Infrastructure of Georgia

  9. Rikoti-Zestaponi Highway Political Advantages • Open policy for international road transportation • Road Improvement is defined as State Priority in the main state policy documents – Basic Data & Direction (BDD) & Georgia Without Poverty • More than 90% of East-West Highway in GOOD conditions • The Shortest link between Black & Caspian Seas • Simplified border crossing procedures Ministry of Regional Development & Infrastructure of Georgia

  10. Thank you for your attention! Ministry of Regional Development & Infrastructure of Georgia

More Related