Sector 20 Scope of Conventional Facilities Project

Sector 20 Scope of Conventional Facilities Project. Demolition of Existing 1700 ft 2 Alcove Bldg. Construction of New 2250 ft 2 Bldg. in ~ same location with 10’ extensions on ends. Steel Frame Building Modifications to existing foundation New HVAC and Electrical Service Interior Finishes

noura
Télécharger la présentation

Sector 20 Scope of Conventional Facilities Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sector 20 Scope of Conventional Facilities Project • Demolition of Existing 1700 ft2 Alcove Bldg. • Construction of New 2250 ft2 Bldg. in ~ same location with 10’ extensions on ends. • Steel Frame Building • Modifications to existing foundation • New HVAC and Electrical Service • Interior Finishes • Construction of New 300 ft2 “RF Hut” in Klystron Gallery • Some Cable Trays and Supports. Cabling to be designed by SLAC and installed by subcontractors as separate project. • Surface mounted electrical distribution in injector alcove area.

  2. Sector 20 Installation (future) Klystron Gallery Elev 0’0” N Existing Stairs Linac tunnel Elev. -35’0”

  3. Sector 20 Conv. Facility Construction Areas Laser Facility N RF Hut

  4. Sector 20 Schedule & Cost • Completion of Title II drawings • January 2005 • Bid and contract with general contractor • February – March 2005 • Construction • April 2005 – April 2006) • Total Estimated Cost - $1.6M • $1.0M const, $0.2M LCW, $0.3M elec. LLP, $0.1M prep

  5. Magnetic Measurement Facility Uses • Undulator magnet tuning – 2 magnet measuring machine test stands • Aligned with same orientation to Earth’s magnetic field as LCLS Undulator Hall. • Undulator fiducialization – large coordinate measuring machine • Cradle assembly area • Magnet storage/temperature acclimation • Work desks in lab and office space for 2 employees

  6. MMF Building Criteria • ~4800 sq. ft. floor space (inc. ~3000 laboratory space) + mezzanine • Locate within an existing building to aid in temperature control • Adequate ceiling height for overhead cranes • Accessible for magnet delivery using trucks and forklifts • Availability of required utilities, esp. electrical service – 600A, 480v 3f

  7. Building 081 Site Layout

  8. Building 081 Current Uses

  9. New Space Allocation for Bldg. 081

  10. MMF Ground Floor Plan

  11. Rear Elevation Mechanical Access Roll up door for magnet delivery Staff access

  12. MMF Schedule & Cost • Completion of Title II drawings • January 2005 • Bid and contract with general contractor • February – April 2005 • Construction • May – November 2005 (Early Finish) • February 2006 (Beneficial Occupancy) • Total Estimated Cost - $ 2.0M • $1.4M const., $0.5M elec. LLP, $0.1 M prep