Designing and Programming Schools As Community Learning Centers. Community Update September 27, 2011. Firestone/Litchfield Community Learning Center. Agenda. Program of Requirements (POR) update Provide basic project information Site information
E N D
Designing and Programming Schools As Community Learning Centers Community Update September 27, 2011 Firestone/Litchfield Community Learning Center
Agenda • Program of Requirements (POR) update • Provide basic project information • Site information • Review results of renovation/addition study • Next Steps • Question and Answer Session
Program of Requirements(POR) update Akron Public Schools Student Typical MHS • Define all rooms and spaces necessary for current and future programs. • Over 30 meetings held with staff, administrators, curriculum, and community. • POR reflects needs for Firestone/Litchfield. CL CL CL SE SE SE SE Rooms SE SE SE CL CL CL MUSIC ART CL CL CL Classrooms MUSIC ART CL CL CL CL CL CL COMP LAB MEDIA CTR CL CL CL AUDITORIUM CAFETERIA LAB LAB LAB LAB LAB LAB GYMNASIUM GYMNASIUM MOD TECH LIFE SKILLS
Firestone/Litchfield Community Learning Center • Proposed Student Capacity: 640Middle School 1,400 High School (including Career Tech) • Proposed Program Area: 364,000 sq ft
Site information • Geotechnical Engineering Analysis • Suitability for development • Site Survey • Documentation of site conditions
Project Goals • Provide facilities meeting needs of the community for future generations. • Provide equity in the District. • Safe and Secure Learning Environments for Teachers and Students.
Renovation Study • OSFC Recommendation; Replace • Community request – study renovation vs. replacement. • Apply Program of Requirements (POR) to current facilities to achieve project goals. • Establish reconfigurations/ additions required. • Review physical building and renovations necessary. • Refine renovation/addition construction cost. • Identify issues to consider in a renovation/addition project.
Renovation Study – Physical Structure • Walls, roofs and windows • Mechanical Systems • Electrical Systems • Interior Finishes • Technology Systems • Fire alarm, sprinkler system • Handicap Accessibility • Site Condition • Hazardous Material
Renovation Study - Additions • Program spaces not currently provided at Firestone/Litchfield; • Sufficient quantity of classrooms and SPED spaces. • Theatre Classroom, Practice/Ensemble spaces, Digital Studio, Dressing Rooms/Makeup, control room. • Additional Life Skills, Career-Based Intervention, OT/PT spaces. • Inadequate/insufficient Spaces; • Special Education, Music Theory, Life Skills, Project Lead-the-Way, undersized classrooms. • Shortage of available spaces requires use of spaces not intended for designed use. • Excessive Space; • Corridors, LRC, Large Instruction Area, certain classrooms, computer labs, drawing studio, Business Ed. Additions Required; 48,000 sq. ft.
Renovation Study – Area Summary 403,000 sq. ft. total required to meet program due to oversize/non-programmable space
Renovation Study – Construction Cost Additional construction cost for reno/add project (LFI)
Renovation Study – Additions • Academic additions to meet curriculum needs. • Cafeterias and Kitchens undersized. • Visual & Performing Arts program needs. • Theatre Classroom, dance, music. • PE/Athletics locker room/coaches areas.
Renovation Study – Considerations Renovation Impacts • Operational Impact • Parking/site circulation • Separate kitchens • Additions impact parking and athletic fields • Larger, less efficient building to maintain and operate than new build • Physical Structure • LEED Silver Certification challenges (envelope, energy efficiency) • Building footprint and configuration • Low structure – academic areas • Construction • Phased construction – adds to construction cost and schedule • Educational Impact • Classrooms do not meet current design standards • Handicap accessibility • Low ceilings • Remote/isolated spaces.
Next Steps • Renovation study validated current decision to replace • Submit POR to JBR/Board • Continue Design Process • Additional meetings with staff, administrators, curriculum and community • Develop site/building layout concepts • Develop renderings • Bidding Documents • Construction • Timeline • Bidding Documents : Spring 2013 • Construction: Spring 2013 through summer 2015