An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pensacola Bay Bridge ReplacementProject Development & Environment Study Presentation to: Florida-Alabama Transportation Planning Organization April 9, 2014

  2. Purpose • Basis for performing the replacement bridge study • Lack of modern safety provisions • Does not meet current desirable navigation requirements • Deteriorating conditions indicate that the twin bridges are structurally deficient • No facilities for bikes and pedestrians • FDOT maintenance costs are substantially increasing without a high value of return on the investment • Will not adequately handle future traffic demand • Study Purpose • Determine the best solution for replacement of the existing bridge

  3. Preferred Corridor Central Corridor

  4. Preferred Corridor – Central • Least disruptive to community facilities • Pensacola Wayside Park • Gulf Breeze Wayside Parks – East & West • Gulf Breeze Boat Launch/Emergency Services • Pensacola Welcome Center • Escambia County Fishing Bridge • Least Disruptive to the Marine Environment • Essential Fish Habitat • Endangered and Protected Species • Cultural Resources • Least Disruptive to Residents and Businesses • Preserved the greatest amount of shoreline

  5. Central Corridor Design Alternatives “Build” Alternatives • Central East • Central West • FDOT/FHWA are also required to assess a “no build” condition throughout the PD&E study

  6. Central East & West –Design Alternatives Central East Central West

  7. 17th Avenue – “Fly-over Ramp” Green Shores Restoration Flag Memorial Fish & Wildlife Bldg Railroad Bridge Welcome Center Boat Launch Fishing Bridge

  8. Wayside Park Concept Plan

  9. Website pensacolabaybridge.com Newsletters One – On – One Meetings CommunityStakeholders Special Interest Groups Neighborhood Associations Local, State & Federal Officials Informal PublicMeetings Project Advisory Group (PAG) Public Outreach Alternatives Public Meeting Fall 2012 Federal, State & Local Government

  10. Current Status and Ending Tasks • Extensive coordination with local governments/state and federal agencies • Refined the alternatives and completed the preliminary engineering analysis • Completed the environmental documents • Air, noise, contamination evaluation • Wetlands, endangered species, essential fish habitat • Archeological & historic Sites (Marine Artifacts) • Parks & recreation sites • Prepared a Draft Environmental Assessment /Section 4(f) National Environmental Policy Act (NEPA) Document • Present the alternatives and the environmental documents to the public • Evaluate comments, complete the Environmental Document and secure approval of the preferred alternative from the Federal Highway Administration

  11. Build Alternatives – Matrix Evaluations • Businesses/Residences • Community Services • Parks/Recreational Sites • Archaeological Sites • Natural Environmental • Public Comments • Project Cost • Currently Preferred Alternative • CENTRALWEST

  12. Avoidance of Park Property – Section 4(f) • Section 4(f) of the 1966 Surface Transportation Act passed by the US Congress requires the Federal Highway Administration (FHWA) to evaluate alternatives that avoid parks, national historic sites, and waterfowl refuges • Prior to the taking of land from any of the above named places FHWA must demonstrate that the avoidance alternatives are not reasonable or prudent . • The Pensacola Bay bridge Replacement study has to comply with this statute. Three potential alternatives were examined: • Avoidance to the East • Avoidance to the West • Remain inside the existing FDOT right of way

  13. Avoidance of Park Property – Section 4(f) • Section 4(f) of the 1966 Surface Transportation Act passed by the US Congress requires the Federal Highway Administration (FHWA) to evaluate alternatives that avoid parks, national historic sites, and waterfowl refuges • Prior to the taking of land from any of the above named places FHWA must demonstrate that the avoidance alternatives are not reasonable or prudent . • The Pensacola Bay bridge Replacement study has to comply with this statute. Three potential alternatives were examined: • Avoidance to the East • Avoidance to the West • Remain inside the existing FDOT right of way

  14. Park Avoidance Alternative - East

  15. Park Avoidance Alternative - West

  16. Park Avoidance Alternative - Central Construction Detour via Navarre I-10 I-110 SR 281 Pensacola Pensacola Bay Bridge Navarre Gulf Breeze US 98

  17. Shared - use Path • Paths on each one of the twin bridges

  18. Shared-use Path • Path on one of the twin bridges (east bridge)

  19. Shared-use Path • Path on one of the twin bridges (east bridge)

  20. Public Hearing • “Build” Alternatives • Central East • Central West • Multi-use path options • Section 4(f) avoidance considerations • Draft Environmental Assessment/Section 4(f) Document • Engineering & Environmental Support Documents • PUBLIC HEARING • June 10, 2014 • Crowne Plaza Hotel (Adjacent to Civic Center) • Time: 5:30 PM to 6:30 PM

  21. Project Schedule 2011 2012 2013 2014 Project Task • Notice to Proceed • Agency and Government Kick-Off Meetings • Data Collection • Corridors Analysis • Corridors Public Meeting • Engineering Analysis • Alternatives Public Workshop • Environmental Analysis • Public Hearing • Environmental Assessment (EA) Approval by FHWA • FHWA Location Design Concept Acceptance N N N N A A A A M M M F F F F M O O O O J J J J A A A A J J J J D D D D S S S S J J J J M M M M

  22. Contact US! www.PensacolaBayBridge.com J. Brandon Bruner, PE Director – Environmental Management Office FDOT, District 3 1074 Highway 90 Chipley, FL 32428 • (850) 330-1509 Joseph.Bruner@dot.state.fl.us Dan Kristoff, PE Project Manager RS&H , Inc. 10748 Deerwood Park Blvd. SouthJacksonville, FL 32256-0597(904)256-2139 Daniel.Kristoff@rsandh.com Nick Arnio, PE, PTOE Deputy Project Manager RS&H, Inc. 6265 Old Water Oak Road, Suite 202Tallahassee, FL  32312(850)558-2800 Nicholi.Arnio@rsandh.com