1 / 1

Conditioning in the PIT

Conditioning in the PIT. Preliminary planed: Condition to -2,3 kV (I<200 nA) and +2,85 kV (I<6nA): R2 in M4/5, R3 in M2-M5, R4 in M5 (only four top rows), R2-R4 in M1. And the rest – all chambers which have been tripped with beam. 17.01.11. Oleg. 1.

oneida
Télécharger la présentation

Conditioning in the PIT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Conditioning in the PIT Preliminary planed: Condition to -2,3 kV (I<200 nA) and +2,85 kV (I<6nA): R2 in M4/5, R3 in M2-M5, R4 in M5 (only four top rows), R2-R4 in M1. And the rest – all chambers which have been tripped with beam. 17.01.11 Oleg 1

More Related