1 / 11

Assignment 2 ENM 506 MSc Environmental Management Arabian Gulf University Ebrahim Ali

EIA. Assignment 2 ENM 506 MSc Environmental Management Arabian Gulf University Ebrahim Ali Eqbal Al-Otaibi Mariam Al-Mawali April 2007. Purpose of Review. to establish if the information in an EIA report is sufficient for decision-making. Basic Project Information. Project Description.

oprah
Télécharger la présentation

Assignment 2 ENM 506 MSc Environmental Management Arabian Gulf University Ebrahim Ali

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EIA Assignment 2 ENM 506 MSc Environmental Management Arabian Gulf University Ebrahim Ali Eqbal Al-Otaibi Mariam Al-Mawali April 2007

  2. Purpose of Review to establish if the information in an EIA report is sufficient for decision-making.

  3. Basic Project Information

  4. Project Description • Technical Process • Project Alternatives • Project Construction • Resources to be used • Waste and Emissions Anticipated • - Solid Waste • - Hazardous Waste • - Water Discharges • - Air Emissions • - Noise • Others

  5. Existing Environmental Condition (Baseline) • Geographic Setting • Climate • Protected areas • Physical • Biological (flora and fauna) • Social Status • Health • Community Activities • Others

  6. Impact Analysis Procedure (risk assessment, direct impacts, indirect impacts) • Physical Receptors • Biological Receptors • - Mangroves • - Desert Plants • Social Receptors • Others

  7. Management Plan Mitigation Measures • Physical Measures • Operational Procedures • Emergency Situations

  8. Monitoring Plans • Chemical Monitoring • Biological Monitoring (selected species) • Social Monitoring

  9. Quality of EIA Report • Executive Summary • Project Description • Baseline Conditions • environmental aspects • Project Alternatives • Institutional Arrangements • Monitoring program • Stakeholder Engagement • Major Adverse Impacts • Major Positive Impacts • legislative requirements • Clarity • Completeness

  10. Overall Rating of the EIA Report