1 / 13

Riunione dei Responsabili e Senior INFN

Riunione dei Responsabili e Senior INFN. Some news on Pixel Upgrade. Pixel TDR - Good progress in write up - Timeline (see next slide): first version to be sent to LHCC referee in June - INFN Gruppo I presentation on Pixel TDR planned on 16-17 July

oral
Télécharger la présentation

Riunione dei Responsabili e Senior INFN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RiunionedeiResponsabili e Senior INFN

  2. Some news on Pixel Upgrade • Pixel TDR • - Good progress in write up • - Timeline (see next slide): first version to be sent to LHCC referee in June - INFN Gruppo I presentation on Pixel TDR planned on 16-17 July • Preliminary Money Matrix with draft contribution from agencies presented to last October RRB. Update April 2012 RRB. • Pixel Project covered • - INFN Pixel contribution 1.4 MCHF • Sharing of Pixel Upgrade Responsibilities • - Discussion well advanced with the Pixel Management Board • April will be crucial with several key technical and managerial discussions to take placewith a final internal Review 25th of April. G.M. Bilei

  3. CMS Upgrade Money Matrix G.M. Bilei

  4. Pixel TDR timeline • Target presentation of final document to LHCC in September 2012 • with draft sent 1-2 months earlier. • Presently we have first draft 70% complete • Some strategic points to be worked into the document. • In April will internally review all strategic and technical points of the project going in the TDR as part of CMS Conceptual Design Review (Apr. 25th) • Gruppo I discussion in July G.M. Bilei

  5. INFN Draft Contribution profile G.M. Bilei

  6. Phase1b proposed preliminary breakdown G.M. Bilei

  7. INFN Pixel Upgrade TDR list Pixel TDR will have two separate lists 1. CMS author list 2. Pixel Upgrade participants intending to contribute to the project (not only Construction, but also simulations, software on & off line, DCS etc.) This list includes Technicians, Engineers, Physicists. Here the list I have got from you. I will provide it to Salvatore. If you have comments or changes let meknow. G.M. Bilei

  8. Genova Totem Alcunimembri del gruppo INFN TOTEM Genovahannocontattato Nadia per ingresso in CMS. Interesse in Fisica, Elettronicaed Hardware. In particolaresonointeressati al progetto di Upgrade dei Pixel. E. Robutti, M. Lovetere, P. Musicoedaltri. Totale~5 FTE Abbiamoparlato con Nadia edentrambiconcordiamo ci sembriunabuona novità e chequestainteressedebbaessereincoraggiato. Opinioni? G.M. Bilei

  9. SelexOffertaBumb Bonding Richiesta di sblocco SJ di 25 Kesu Pisa inviataai referee. Domanimeeting con Nadia edi referee. Nadia mi ha dettoche ha parlato con i referee e non dovrebberoesserciproblemi. Urgentecapire con Selexicosti di produzione finale. Unaoffertainviata fine delloscorso anno non sembravaesseresoddisfacente. Sono in corsocontatti /negoziazioni per averecondizionimigliori. G.M. Bilei

  10. Test Beam Frascati Prossimopossibileperiodo: 30 Aprile - 4 Maggio 2012 Interessead organizzareunaattivita` comunedi test modulo pixel sufascio? In casopositivo, organizzare un piccolo sforzo e definireprogramma di lavoro. http://www.lnf.infn.it/acceleratori/btf/ G.M. Bilei

  11. Some points to follow up • Pixel Upgrade • ROC wafer from Roland and testing in PSI (first) and Padova (later) • This is the only element we don’t have control yet. • Roland promised the wafers several time, need to follow up with him. • Pixel Simulation: increase INFN contribution. 1 post-doc available • Operation/DPG/POG • Define Technical/Engineering support for 2013 LS1 from Tracker and INFN • In particular in order to define funding request for 2013, by June we should • define the support that we could provide compatibly with other activities. • Possibly increase INFN contribution in the area of Radiation Damage • studies and simulation. • Possibly improve the way we contribute to Operation, DPG, POG tasks • and get toward an organized contribution from INFN. • Tracker Upgrade • INFN R&D funding to support activities for the preparation the proposal for • Tracker Upgrade • INFN Support Track Trigger Simulations and better integrate them with Trigger • Hardware activities G.M. Bilei

  12. Next Tracker Meetings • Next meetings • MoltiMB Pixel Upgrade meeting previstiprossimomese • Tracker week 23-27 Apr. • Conceptual Design Review 25 Apr • CMS Upgrade week 21-25 May • Pixel Upgrade Grindelwald(CH) 28-31 Aug. • Fatemisaperenumerostimatodeipartecipanti. • Tuesday 28 am Workshop registration • Tuesday 28 pm Working Group parallel session (e.g. Cooling in parallel with Test beam) • Wednesday 29 am Working Group parallel sessions (e.g. Simulations in parallel with BPIX module production) • Wednesday 29 pm Plenary Phase 1 meeting - Part 1 • Thursday 30 am Plenary Phase 1 meeting - Part 2 • Thursday 30 pm Off-site visit (e.g. mountain location).  • Friday 31 am Phase 1 Management Board (restricted) in parallel with Informal Working meetings. • Friday 31 2pm Close of meeting. G.M. Bilei

  13. INFN Next meeting? • If useful we might consider to have a second INFN workshop someplace else • (autumn?) • Continue to hold short (2 two hours) INFN meetings at CERN during Tracker • weeks to touch down most important topics with short presentations. • Continue to hold about 1.5 hour meeting bi-weekly or when urgently needed. • Grazie agli speakers ed a tuttiipartecipanti G.M. Bilei

More Related