1 / 16

Case Study

Case Study. PVC Column Replacement. My Steel Casing has Disappeared. Ph 1300 133 000. Bore Casing & Screens Pipes & Components Environmental Drilling Water Treatment Safety Products Sand Spears Pumps. Case Study. The Problem.

ornice
Télécharger la présentation

Case Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Case Study PVC Column Replacement My Steel Casing has Disappeared Ph 1300 133 000 Bore Casing & Screens Pipes & Components Environmental Drilling Water Treatment Safety Products Sand Spears Pumps

  2. Case Study The Problem Your steel Column has been in the ground for 10-30 years and the pump pressure and water supply has been dropping constantly. The pump is pulled up and the column is found to have corroded away and has holes everywhere and in spots only rust is holding it together. Ph 1300 133 000 Bore Casing & Screens Pipes & Components Environmental Drilling Water Treatment Safety Products Sand Spears Pumps

  3. Case Study In some instances steel pump column has corroded in a time frame of less than 2 years. If the column is replaced by steel again the same occurrence will happen in the same time and the process will just be repeated. Ph 1300 133 000 Bore Casing & Screens Pipes & Components Environmental Drilling Water Treatment Safety Products Sand Spears Pumps

  4. Case Study Requirements To have a lifetime of over 20 years. Corrosion resistance.. Pump the same amount of water as originally. To withstand the Installation depth. Ph 1300 133 000 Bore Casing & Screens Pipes & Components Environmental Drilling Water Treatment Safety Products Sand Spears Pumps

  5. Case Study Requirements Use standard shafts, original if possible. Use standard tools for assembly. Connect to original Discharge Head. Match the column thread on discharge bowl of the pump. Ph 1300 133 000 Bore Casing & Screens Pipes & Components Environmental Drilling Water Treatment Safety Products Sand Spears Pumps

  6. Case Study Solution The solution is to use replace the old corroded steel column with a non-corrosive material. The new column to be the same length as the original column so the column shaft can be re-used. Ph 1300 133 000 Bore Casing & Screens Pipes & Components Environmental Drilling Water Treatment Safety Products Sand Spears Pumps

  7. Case Study Deps Answer To manufacture and supply new column made from PVC, which is noncorrosive and its integrity is strong enough to withstand the bore installation’s depth. Ph 1300 133 000 Bore Casing & Screens Pipes & Components Environmental Drilling Water Treatment Safety Products Sand Spears Pumps

  8. Case Study Deps Answer The column will have the same overall length as the original, so that the column shaft can be reused. Stainless and Bronze adaptors are manufactured so the Pvc column will fit the discharge head and the pump discharge thread. Ph 1300 133 000 Bore Casing & Screens Pipes & Components Environmental Drilling Water Treatment Safety Products Sand Spears Pumps

  9. Alternatives Case Study Other Alternatives where to use fibreglass column, this has to be imported or manufactured, with a lead time of over many weeks. Stainless pipe could be used, but is very expensive. Ph 1300 133 000 Bore Casing & Screens Pipes & Components Environmental Drilling Water Treatment Safety Products Sand Spears Pumps

  10. Alternatives Case Study Steel column can be painted with a epoxy paint or dipped, plus it could also be wrapped in tape. Keep replacing every few years. Ph 1300 133 000 Bore Casing & Screens Pipes & Components Environmental Drilling Water Treatment Safety Products Sand Spears Pumps

  11. The End Result Case Study The specialized Pvc column was delivered on time and successfully installed by the pump installer. After having the Pvc column in the ground for over 2 years it was pulled up and inspected, there was no sign of any issues. Pvc column has been used for over 10 years now and there has not been an issue with this product failing Ph 1300 133 000 Bore Casing & Screens Pipes & Components Environmental Drilling Water Treatment Safety Products Sand Spears Pumps

  12. Article Thank you for taking the time to look at the information we have created for you, We hope this will be of assistance to solving your piping, drainage and drilling challenges. If you have any more questions Please feel free to contact myself or one of our team Bore Casing & Screens Pipes & Components Environmental Drilling Water Treatment Safety Products Sand Spears Pumps

  13. Case Study For more Articles, Case Studies, How to and Information go to www.deps.com.au then click onto Handy Links or contact us on 1300 133 000 askus@deps.com.au Ph 1300 133 000 Bore Casing & Screens Pipes & Components Environmental Drilling Water Treatment Safety Products Sand Spears Pumps

  14. Deps Products and Capabilities Slotting Cutting Fabricating Pipe Testing Perforation Drawings Spear Points Safety Pumps Threading Turning Welding Slitting Designing Water Treatment Pipe Drilling products Pipe Fittings Ph 1300 133 000 Bore Casing & Screens Pipes & Components Environmental Drilling Water Treatment Safety Products Sand Spears Pumps

  15. Solving your Piping, Drilling and Drainage Challenges with Trust and Integrity Ph 1300 133 000 Bore Casing & Screens Pipes & Components Environmental Drilling Water Treatment Safety Products Sand Spears Pumps

More Related