The “Design - Build Chain” Concept

MORTENSON The “Design - Build Chain” Concept Pat Burns, P.E., BGen USAF(R) Vice President Mortenson Construction Federal Contracting Group 703-498-8624 Overview Background On What Started The Idea The “Design - Build Chain” Model Results It Achieved

oshin
Télécharger la présentation

The “Design - Build Chain” Concept

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MORTENSON The “Design - Build Chain” Concept Pat Burns, P.E., BGen USAF(R) Vice President Mortenson Construction Federal Contracting Group 703-498-8624

  2. Overview • Background On What Started The Idea • The “Design - Build Chain” Model • Results It Achieved

  3. ACC Design/Construction Workload February 2001 Staff was using 3 Year AVG Historical Workload Projection

  4. ACC Design/Construction Workload March 2001 Asked to See 5 Year Ahead Programmed Workload Projection

  5. ACC Design/Construction WorkloadSeptember 2001 How To Handle Actual 300% Workload Increase with same size staff ?

  6. The “Design - Build Chain” Link the design - build process steps to leverage project delivery !

  7. 3D Virtual Engineering Visualization Ellsworth AFB Main Gate Design Concept What is it? • Using commercial off the shelf software to bring text and drawings to life in 3D • Fully narrated CD with voice-over and background soundtrack 3D / 4D Video • Illustrates siting, design, exterior rendering, and interior walkthrough Why is it value added? • Bridges the gap between design professionals and facility users • Focuses on the end product • Lays the foundation for the real design How do we plan to accomplish it? • ACC now uses 3D Virtual Engineering Visualization for every MILCON project • Early teaming with A/E & user pays off Bridges gap between user’s vision and design professional’s concept

  8. The “Design - Build Chain”

  9. Integrated Planning Framework (IPF) What is it? • Integrated 3D approach to improve base development planning • Fuses WG/CC vision, Base Master Plan, and long-term investment strategy • Formally Zones the base and puts in place Base Planning Commission Nellis AFB Main Base Area Why will it bevalue added? • Formally controls base planning from environmental clean up, to construction • Integrates individual building planning in larger base planning framework • Opens up base development plans to local communities via website 3D GIS Mapping access How do we planto accomplish it? • Piloted at Nellis and Langley AFBs • Completing all ACC bases in CY05 Fuses individual project plan into larger base development program

  10. The “Design - Build Chain”

  11. Customer Concept Documents (CCD) What is it? • Early, professional look at user requirements • On site study of utilities/site constraints • Guidance in architectural/design parameters • Accurate parametric cost estimates • 3D model, floor plans, communication, furniture Why is it Value Added? • Clearly pins down user requirements up front • Provides reliable detailed cost estimate • Delivers general floor plan, elevations, and utility layouts… essentially a 35% Design How Do We Plan To Accomplish it? • We Conduct a Customer Concept Document Charrette on every MILCON project • Gives us a 6 month – 1 year head start ! Ensures what you plan and program is what you design to

  12. The “Design - Build Chain”

  13. Quality Schedule & Cost (QSC) What is it? • Best Value approach to awarding contracts • Balances Quality, Schedule, & Cost according to what’s most important for that particular project Why is it Value Added? • Takes advantage of contractor strengths • Tightens emphasis on improved schedules • Improves emphasis on cost controls How Do We Plan To Accomplish it? • Using QSC Best Value on every MILCON Project Possible $$ Experience Quality Schedule Emphasizes design quality schedule & cost are what we award on

  14. The “Design - Build Chain”

  15. Schedule & Cost Goals FY 98 MILCON Schedule Growth What is it? • AF/Agent/Contractor focus on 0% Schedule Growth • Implemented 30-40% shorter construction duration • AF/Agent/Contractor focus on 0% Cost Growth • Implemented Agents in tighter cost control Why is it Value Added? • Every % of a $1.5B annual program is a lot of $$ • Schedule growth in military is a Readiness issue How Do We Plan To Accomplish it? • $5M project max duration is 365 days. • $20M project max duration is 540 days. • Accomplish “Agent Score Card” on Corps and NAVFAC Agents on every project and overall 75% Behind Schedule On Schedule FY 98 MILCON Cost Growth 50% Over Cost >2% <2% Within Cost Keeps focus on what we design and award is what we construct

  16. The “Design - Build Chain” $$ Experience Quality Schedule

  17. Construction 4D Modeling What is it? • Linkage of 3D design model with construction schedule into a “4D construction model” • Living construction plan for both the entire site and key project elements that gets updated over time Why will it be value added? • Forms team commitment and solidifies the plan for project construction • Integrates design, especially in design-build to schedule constructability How do we plan to accomplish it? • Pilot model used for overall integration of F-22 Beddown Construction at Langley AFB • Will phase in on all major projects over $50M Focuses the construction team to deliver the project on schedule

  18. The “Design - Build Chain” $$ Experience Quality Schedule

  19. The Red Zone What is it? • An execution charrette • ACC/Agent/Contractor meeting 90 days before beneficial occupancy • Structured plan that aims to move projects to completion faster and more efficiently Why will it be value added? • Forms team commitment and solidifies the plan for project completion and financial close-out • Identifies all potential obstacles to on-time project completion and closure How do we plan to accomplish it? • 30 min. training video distributed to all customers, agents, and contemporaries • Now used today on all Air Force and Army MILCON projects ! Focuses the construction team to deliver the project right

  20. The “Design - Build Chain” 75% $$ Experience Quality Schedule

  21. ACC MILCON Cost Growth COST GROWTH = CONTRACT CHANGES AFTER AWARD ORIGINAL CONTRACT AWARD PRICE Zero % Cost Goal Established GOOD # COMPL/# PROJ % CNS Complete 16/16 100% 15/15 100% 19/19 100% 16/21 99% 10/17 97% 7/27 62% 1/30 29% 4% of $1.5B annual construction program is worth saving!

  22. ACC MILCON Schedule Growth New Construction Duration Times Established Per Cent of Projects on schedule GOOD # COMPL/# PROJ % CNS Complete 16/16 100% 15/15 100% 19/19 100% 16/21 99% 10/17 97% 7/27 62% 1/30 29% From 50% Behind Schedule for last 3 Yrs to 90% Ahead of Schedule Today

  23. Results Summary “Design - Build Chain concept is working for ACC as an integrated project delivery process!” • Handling 300% project workload increase • Achieving 30-40% shorter construction durations • 90% of projects finishing early vice 75% late • Delivering quality projects to user expectations • Earned best Design & Construction in USAF 4 years in a row • Selected by Buildings Magazine as #8 of “Top 25 Firms for 2004” • Selected by ENR Magazine for “Top 25 Newsmaker Award” 2005 3D Linked the Design - Build process to leverage project delivery !

  24. Questions?