1 / 10

Happy Future of Ku-Band

Happy Future of Ku-Band. Tomomitsu Baba. The current status. Stage 1 finish on 1998 Sep 30 Stage 2 from 1998 Aug 1 to 1999 Sep 30 Wide Project Budget (how match?) Band-width is reduced from 9Mbps to 6Mbps. Band-Width Reallocation. Please Mr. MIZUNO. Future Plan.

pabla
Télécharger la présentation

Happy Future of Ku-Band

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Happy Future of Ku-Band Tomomitsu Baba

  2. The current status • Stage 1 finish on 1998 Sep 30 • Stage 2 from 1998 Aug 1 to 1999 Sep 30 • Wide Project Budget (how match?) • Band-width is reduced from 9Mbps to 6Mbps

  3. Band-Width Reallocation • Please Mr. MIZUNO

  4. Future Plan • If we produce the new and big results of research, we can use the satellite network in the next year. • Please make your best effort.

  5. AI3 Future ChallengesResearch Topics

  6. Our Goal • To provide the operation technique of the satellite internet • To provide the next generation methods of the satellite internet • To provide the fine application with the satellite internet • Others and details are talked by Prof. Murai

  7. The operation technique • SNMP observe the satellite internet • To find out the best parameter for satellite • BGP4 • The way of finding out where is trouble • The relationship between the signal power and the weather

  8. The next generation methods • UDLR • Adaptive band width allocation • Dynamic Routing allocation • TCP and IP over satellite • IPV6

  9. The application • Web chashe and NNTP with IP multicast over satellite • NTP and BGP over satellite • Interactive TV with satellite multicast and UDLR • Distant Learning • Weather monitoring

  10. Who How and When • Who is interested in these topics? • Who has responsibility of the research? • How to drive the research? • When do you make the papers? • Etc……

More Related