Reducing Idling Times of Vehicles Along a Busy Corridor – A Case Study (City of Burnaby) Michael Cetnarowski, P.Eng. DMD & Associates Ltd. Agenda Problem with Idling Vehicles Goal Solution Hastings Project – Analysis Hastings Project – Results /GHG reduction Questions.

pdefranco
Télécharger la présentation

Agenda Problem with Idling Vehicles Goal Solution Hastings Project – Analysis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Reducing Idling Times of Vehicles Along a Busy Corridor – A Case Study (City of Burnaby)Michael Cetnarowski, P.Eng.DMD & Associates Ltd.

  2. Agenda • Problem with Idling Vehicles • Goal • Solution • Hastings Project – Analysis • Hastings Project – Results /GHG reduction • Questions

  3. Problem with Idling Vehicles • Idling Vehicles = Air Pollution • 1L gasoline = 2.3 kg of CO2 • Stop & Go Traffic

  4. Goal • Reduce the number of stops of vehicles • Reduce the time vehicles are idling

  5. Solution • Adjust timings in the traffic controllers • Create a “green band” to eliminate stops Intersection 1 Intersection 2 Intersection 3

  6. Hastings Street – Analysis • From Ingleton Ave. to Cliff Ave. • 18 Intersections • 11 Pedestrian Signals • 4.4 km long

  7. Tracked position & speed with a GPS receiver • Captured real-time data • Measured corridor performance Hastings Street – Analysis

  8. After Before

  9. Results • Driving time reduced by 5 minutes • 27% reduction in travel time • Improved pedestrian intersection re-service time

  10. Natural Resources Canada’s (NRC) Idling Calculator • Province = BC • AM+PM = 309 sec saved = 5 min • Price of gas = 1.05 $/L • Approx. 2350 vehicles/hr AM: 6:00am-9:30am = 3.5hrs PM: 2:30pm-6:30am = 4hrs Approx. 17625 vehicles • NRC gives results!

  11. Hastings Street Corridor Results Annual Environmental Benefits • Fuel consumption reduced by 746,329 litres • Savings of approx. $783,645 ($44.46 per driver) • GHG emissions reduced by approx 1.8M kg • Equal to taking 1,295 vehicles off the road • Equal to planting 10,883 trees to absorb GHG emissions