Treatment Plant Additions (Total $96,600,000)

Low Service PS Improvements $20,633,000 Electrical Upgrades, Pump Rehab, Piping Gallery Improvements Equipment Replacements, Security. Flocculation/Sedimentation Basin Impr . $14,321,000 Equipment Replacements and Structural Improvements. High Service PS Improvements $12,172,000

percy
Télécharger la présentation

Treatment Plant Additions (Total $96,600,000)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Low Service PS Improvements $20,633,000 Electrical Upgrades, Pump Rehab, Piping Gallery Improvements Equipment Replacements, Security Flocculation/Sedimentation Basin Impr. $14,321,000 Equipment Replacements and Structural Improvements High Service PS Improvements $12,172,000 Electrical Upgrades, Pump Rehab, Piping Gallery Improvements, Equipment Replacements Raw Water Intake Impr. $1,775,000 Structural, Interior and Exterior Improvements Filter System Improvements $37,695,000 Piping and Valve Replacements and Rehabilitation, Pumping System Impr., Filter Wash Water Facility Impr., etc. Heatherdowns PS Impr. $5,530,000 Electrical Upgrades, Pump And Equipment Rehab, Structural Improvements Chemical Feed System Impr. $10,384,000 Carbon, Alum, Lime and Soda Ash New Disinfection Facilities $8,000,000 Chlorine and Chlorine Dioxide Generation and Feed Equip., Masonry Building • Additional Facility Improvements • SCADA System Replacement $5,000,000 • Power Supply Improvements $ 7,000,000 • HVAC Improvements $1,869,000 • Filter Plant Roof Replacements $15,000,000 • 5. Structural Repairs to Plant $2,638, 000 • 6. Administration Bldg Offices and Property • Acquisition $4,804,000 Treatment Plant Additions (Total $96,600,000) Basin 7 – includes a 20 MGD Treatment Train including, Flocculation, Sedimentation and Filtration Facilities - $53,400,000 Basin 8 – includes a 20 MGD Treatment Train including, Flocculation, Sedimentation and Filtration Facilities - $43,200,000 Residuals Handling $20,542,000 Press and Thickener Rehabilitation, Additional Thickener Tank, Additional Press and Bldg Expansion Toledo Division of Water Treatment - Improvement Costs Total Cost - $263,963,000

More Related