This article discusses the demonstration conducted at the NERSC Data Center, comparing traditional AC power systems with new DC power systems. The demonstration included facility-level and rack-level distribution, power measurements, and modified servers. The results showed a 10-20% improvement in overall efficiency at the facility level. The article also explores the implications and potential benefits of transitioning to DC power systems in data centers.

peterl
Télécharger la présentation

NERSC Data Center

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NERSC Data Center By Iwona Sakrejda NERSC is supported by the Office of Advanced Scientific Computing Research in the Department of Energy Office of Science under contract number DE-AC02-05CH11231.

  2. Outline • DC power test at LBL • CRT “Green Data Center” NERSC’s new home

  3. What the demonstration included • Side-by-side comparison of traditional AC system with new DC system • Facility level distribution • Rack level distribution • Power measurements at conversion points • Servers modified to accept 380 V. DC • Artificial loads to more fully simulate data center

  4. Power Consumption: 100 W System Load Load 100W Total 275W VR 20W PSU 50W Server fans 15W UPS +PDU 20W Room cooling system 70W source: Intel Corporation 4

  5. Details • Safety was reviewed by a committee of the partners. No significant issues were identified. Only concern was whether fault currents would be large enough to trip protective devices. • All distribution equipment is UL rated for DC applications • No commercially available DC connector exists in a size convenient for use with servers • Reliability should be improved – fewer potential points of failure. Eliminating heat sources should help. • Final report will address safety and applicable codes and standards

  6. Additional items included • Racks distributing 48 volts to illustrate that other DC solutions are available, however no energy monitoring was provided for this configuration • DC lighting was included!

  7. The layout you will see

  8. Typical AC Distribution Today

  9. Facility-Level DC Distribution 380V.DC

  10. Rack-Level DC Distribution

  11. AC system loss compared to DC 9% measured improvement 2-5% measured improvement

  12. Measured Results • Facility level overall efficiency improvement: 10 to 20% • Smaller rack level overall efficiency improvement but other benefits include: • Thermal benefits • Smaller power supply in server • Transition strategy for existing centers

  13. Implications could be even better for a typical data center • Redundant UPS and server power supplies operate at reduced efficiency • Cooling loads would be reduced. • The UPS system used in the AC base case system performed better than benchmarked systems – efficiency gains could be higher. • Further optimization of conversion devices/voltages is possible

  14. Outline • DC power test at LBL • CRT “Green Data Center” NERSC’s new home

  15. Goal • LEED Silver • Certified - 40-50% of non-innovation points • Silver - 50-60% • Gold - 60-80% • Platinum - over 80% • Why not higher? Power.

  16. Leed standards • Define "green building" by establishing a common standard of measurement • Promote integrated, whole-building design practices • Recognize environmental leadership in the building industry • Stimulate green competition • Raise consumer awareness of green building benefits • Transform the building market

  17. Concept CRT

  18. Looking to the bay

  19. Reduced windows cut solar heating

  20. Columnless machine room. Except where offices are.

  21. Majority of temp allow natural cooling

  22. Optional Heating

  23. Optional Mechanical Separation

  24. Study of 25 data centers Metric 1.2 for this Project Average of Facilities Measured-1.8

  25. Concept of layout

  26. Time Line NERSC is supported by the Office of Advanced Scientific Computing Research in the Department of Energy Office of Science under contract number DE-AC02-05CH11231.

  27. Project Budget

  28. Construction Cost Increases • Labor Escalation 1.5 X in a 2 year period • Total Material Cost up 23% since 2004 • Structural Steel Shapes – up 25% • Rebar – up 45% • Lumber Spot Prices – up 95% • Gypboard – up 20% • Copper pipe – up 20% • Crude Oil – up 97% • Electrical Copper • Code Escalation