1 / 35

Status Report of Taiwan Two Meter Telescope

Status Report of Taiwan Two Meter Telescope. Yi Chou Graduate Institute of Astronomy National Central University. 2M Telescope Project. Project started in early 2006 Funding Ministry of Education:5500 project Telescope : ~2.6M USD National Science Council Instrument: ~1.3M USD

petula
Télécharger la présentation

Status Report of Taiwan Two Meter Telescope

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status Report of Taiwan Two Meter Telescope Yi Chou Graduate Institute of Astronomy National Central University 2011兩岸天文儀器會議

  2. 2M Telescope Project • Project started in early 2006 • Funding • Ministry of Education:5500 project • Telescope : ~2.6M USD • National Science Council • Instrument: ~1.3M USD • NCU Foundation • Building, dome & Transportation : ~3.5M USD • Total: ~7.4 M USD 2011兩岸天文儀器會議

  3. Telescope 2011兩岸天文儀器會議

  4. 2M Telescope 2011兩岸天文儀器會議

  5. Telescope Manufacture • Nishimura Opt. Ltd. won the contract and started to design and build the telescope in early 2007. 2011兩岸天文儀器會議

  6. Telescope Manufacture 2011兩岸天文儀器會議

  7. Telescope Design (10/2007) 2011兩岸天文儀器會議

  8. Primary Mirror Polishing (06/2008) 2011兩岸天文儀器會議

  9. Primary Mirror (02/2009) 2011兩岸天文儀器會議

  10. Parts of Telescope (02/2009) 2011兩岸天文儀器會議

  11. Taiwan Two Meter Telescope (03/2010) 2011兩岸天文儀器會議

  12. Integration Test (03/2010) 2011兩岸天文儀器會議

  13. 2011兩岸天文儀器會議

  14. 2M in Taiwan Now (in a Warehouse) 2011兩岸天文儀器會議

  15. Site and Building 2011兩岸天文儀器會議

  16. NCU Mt Jade ~4,000 m Lulin Observatory~2,860 m Alisan 2011兩岸天文儀器會議

  17. Lulin Observatory 40 cm Telescope LOT 1meter teelscope Future 2M Telescope EPA Lab TAOS-A/B Weather Station TAOS-C NCKU ELF TAOS-D Taida LELIS 基地台 2011兩岸天文儀器會議 環保署

  18. Sketch Maps of 2M Telescope and Observatory Sketch Map of the 2m telescope and observatory Imaginary view of the 2m Observatory 2011兩岸天文儀器會議

  19. Difficulties We Met …… • However, there is a new regulation in Taiwan that the mountain area above 1500 m was assigned as protected area and only limit buildings are allowed. Astronomical observatory was not included. • Thank to assistant from Chairman Wang of Legislative Yuan to coordinate government ministries, astronomical observatory was finally put into the list in late 2007. • The building permit was issued on 11/15/2008 from Chiyi county government. • A local company won the contract for the building and was ready to start the construction in May 2009 …… 2011兩岸天文儀器會議

  20. Difficulties We Met …… • In May 2009, Environment Protection Administration (EPA) informed us the construction must be suspended because the 2M building is located inside an animal protection area. • Environmental impact assessment must be done in advanced. • In this animal protection area, four season’s animal inspection is essential. • The building permit was invalid • The building contract had to be rescinded • Environmental impact assessment was made from Oct 2009 to Nov 2010 and the report was approved by EPA in March 2011. The new budget was set and the construction will be started soon. 2011兩岸天文儀器會議

  21. Instrument 2011兩岸天文儀器會議

  22. Instrument • The first generation instrument for 2M telescope is the Simultaneous Multi-color Imager. • This 4-color simultaneous imager consists of • Dichroic mirrors and filters • split the light into 4 bands: 552-689nm(r), 691-815nm(i), 815-915nm(z) and 967-1024nm(y) • higher QE CCD cameras • 3 sets of 1100-series cameras were purchased from Spectral Instruments Inc.,USA, within E2V back illuminated deep depletion CCDs for r,i,z bands • The other one (NCU-Cam1), with within fully depleted CCDfrom Hamamatsu photonics K.K., Japan. and Polycold cryo-cooler, is developed by NCU instrument team 2011兩岸天文儀器會議

  23. 4-color Simultaneous Imager 2011兩岸天文儀器會議

  24. 4-color Simultaneous Imager 2011兩岸天文儀器會議

  25. Instrument Lab at NCU • To make the multi-color imager for 2M telescope, as well as for future instrument developments, NCU set up an instrument lab in early 2009. • Key persons of NCU lab • Jason Wu: Electrical engineer • Duncun Chen: Project assistant • Azure Yang: Project assistant 2011兩岸天文儀器會議

  26. Instrument Development 2011兩岸天文儀器會議

  27. Three 1100-series Cameras Arrived 2011兩岸天文儀器會議

  28. A 1100-series Camera Tested with LOT 2011兩岸天文儀器會議

  29. LOT/SI1100 First light Image 2011兩岸天文儀器會議

  30. LOT/NCUcam-1 First Light Image 2014/6/5 2011兩岸天文儀器會議 31

  31. Optical Adopter Design Complete 2011兩岸天文儀器會議

  32. Optical Adopter 2014/6/5 2011兩岸天文儀器會議 33

  33. Summary • The manufacture of telescope has been completed and the telescope has shipped to Taiwan in 2010. • The environment impact assessment has been completed and the new budget has set. The construction will be started soon/ • The 4 cameras, including the one we develop (NCUcam1), and the optical system for the 4-color simultaneous imager have been complete. The integration test cannot be done due to the delay of telescope dome construction. • We are now looking for suitable telescope that allows us to test instrument’s performance, or, furthermore, start scientific observations. 2011兩岸天文儀器會議

  34. Thank You 2011兩岸天文儀器會議

More Related