1 / 27

PROIECTUL

PROIECTUL. The Glass Bridge Construction of the Skywalk began March of 2004 and is estimated to be completed by 4th quarter of 2006. The glass bridge will be suspended 4,000 feet above the Colorado River on the very edge of the Grand Canyon.

ppetillo
Télécharger la présentation

PROIECTUL

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROIECTUL

  2. The Glass Bridge Construction of the Skywalk began March of 2004 and is estimated to be completed by 4th quarter of 2006. The glass bridge will be suspended 4,000 feet above the Colorado River on the very edge of the Grand Canyon. On May 2005, the final test was conducted and the stucture passed engineering requirements by 400 percent, enabling it to withstand the weight of 71 fully loaded Boeing 747 airplanes (more than 71 million pounds. The bridge will be able to sustain winds in excess of 100 miles per hour from 8 different directions, as well as an 8.0 magnitude earthquake within 50 miles. More than one million pounds of steel will go into the construction of the Grand Canyon Skywalk.

  3. REALIZAREA

More Related