1 / 5

Identify Critical Path

Identify Critical Path. Buck Converter. Switching Current exist in the input side. Boost Converter. Critical path. Buck-Boost Converter. Identify Critical Path. Buck Converter. Boost Converter. Critical path. Buck-Boost Converter. Identify Critical Path. Non-Inverting. Buck Converter.

Télécharger la présentation

Identify Critical Path

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Identify Critical Path Buck Converter Switching Current exist in the input side Boost Converter Critical path Buck-Boost Converter

  2. Identify Critical Path Buck Converter Boost Converter Critical path Buck-Boost Converter

  3. Identify Critical Path Non-Inverting Buck Converter Boost Converter Critical path Inverting Buck-Boost Converter

  4. What Can We Do In PCB Layout?--Buck example Buck Converter Boost Converter Buck-Boost Converter • Minimize critical path area • Separate noisy ground path from quiet ground

  5. What Can We Do In PCB Layout?--Buck-Boost example Non-Inverting Buck Converter Boost Converter Buck-Boost Converter

More Related